Prior Information Notice For Construction Work – Ve2224 Part-General Contractor Mechanics. Fraport Ag Completed The New Construction Of Terminal 3 Including Parts Of Pier G. Parts Of Pier G Have Already Been Put Into Operation. This Also Applies To The Main Terminal Building And To Gates H And J. Part Of Gate G Has So Far Only Been Built As A Refined Shell. This Part Of The Building Is Or Will Be Separated From The Areas That Have Been Put Into Operation Through Interim Measures And Is Now To Be Completely Expanded. For The Structural Realization, The Construction Services Include: Advertised In The Following Trades: Expansion Electrical Building Automation Ela Including Communications Technology Bos Bma Security Technology (Video, Gma) Mechanics Baggage Conveyor Systems Canopy Extended Shell Construction The Subject Of This Tender Is Services For The Mechanics Trade With, Among Others, The Following Service Areas: Kg 410 Water/Waste Water • Dismantling, Adjustments Drinking/Dirty Water Pipes Sml/Stainless Steel Up To Dn 125 Approx. 230 M • Assembly Of Drinking/Dirty Water/Condensate Pipes Sml/Stainless Steel Incl. Fittings, Connecting And Transition Pieces, Fastenings, Fittings Up To Dn 125 Approx. 1,680 M • Fire Protection Ducts Through F90 Components For Pipes Sml And Stainless Steel Incl. Signage Approx. 120 Pieces • Assembly Of Sanitary Objects Toilets, Urinals, Built-In Washbasins, Sinks, Sinks, Showers Incl. Accessories Approx. 95 Pieces Kg 420 Heating/Cooling • New Installation Of Chillers, Outdoor Installation Power 1000 Kw Incl. Accessories: Approx. 2 Pieces • New Installation Of Circulating Air Cooling Units, Fan Coil Units 2.5 Kw Incl. Accessories, Fastening And Connection: Approx. 85 Pieces • New Installation Of Surface Cooling System -> Cooling Ceiling Sails: Approx. 200 Pieces • New Installation Of Heating Surfaces Incl. Valves, Screws And Thermostat Heads: Approx. 45 Pieces • New Installation Of Heating/Cooling Steel Pipe, Welded Incl. Insulation Sheet Metal Jacket Formed/Connecting/Transition Pieces/Fastening Material/Shut-Off Fittings/Non-Return Valve/Strainer Dn 15-250: Approx. 8,500 M • New Installation Of Line Regulating, Shut-Off, Three-Way Valves Dn 15-200: Approx. 250 Pieces • New Installation Of Fittings, Ball Valves, Kfe Valves Dn 15-40: Approx. 700 Pieces • New Installation Of Ventilation Pots, Air Bottles Dn 15-200: Approx. 130 Pieces • New Installation Of Built-In Parts/Manometers/Thermometers/Sensor Pockets/Pumps: Approx. 280 Pieces Kg 430 Room Air Technology • Installation Of 220 Pieces Of Blinds/Fire Dampers (K90) With Drive, Including Elastic Connectors, Compression Ring Gap • Assembly Of 160 Pieces. Square, Round Electric. Volume Flow Controller • Assembly Of Approx. 5,500 M² Of Air Duct/Fittings Including Thermal Insulation Made Of Galvanized. Sheet Steel Including Ventilation Grille • Installation Of Approx. 355 Pieces Of Poppet Valve, Swirl Radial Outlet • Installation Of Approx. 130 Pieces Of Silencer, • Installation Of Approx Def. Sheet Steel, Dn 100 - Dn 500 Kg 430 Smoke Extraction • Installation Of 25 Smoke Extraction Roof Fans Between 10,000 M³/H To 25,000 M³/H Incl. Accessories • Monta
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.