The Subject Of The Order Is A Comprehensive Thermal Modernization Of The Building, Adaptation Of Primary School No. 9 At Ul. Księdza Kardynała Stefana Wyszyńskiego 57, Plot No. 128/6, 139/5, 153/2, 54, 55/7 District 00012 Leszno, Including Renovation Of Rooms, Delivery Of Furniture And Land Development In Accordance With The Scope And Provisions Resulting From This Swz Together With Annexes. For The Implementation Of The Project Entitled: Comprehensive Thermal Modernization Of The Buildings Of Primary School No. 9 In Leszno And The Complex Of Agricultural And Construction Schools” The City Of Leszno Obtained Funding Under The Regional Program European Funds For Greater Poland 2021-2027. Action 2.1. Supporting Energy Efficiency And Reducing Greenhouse Gas Emissions. Funding Application Number Fewp.02.01-Iz.00-0067/24. The Scope Of Thermal Modernization Works Of The Building Includes, Among Others: 3.1. Comprehensive Modernization Of The Internal Central Heating Installation, 3.2. Comprehensive Modernization Of The Internal Hot Water Installation, 3.3. Insulation Of The Buildings Roof, 3.4. Insulation Of External Walls, 3.5. Replacement Of External Joinery And Improvement Of Building Ventilation,3.6. Insulation Of External Walls Of Plinths, 3.7. Implementation Of Mechanical Ventilation With Heat Recovery In The Gymnasium, 3.8. Implementation Of A Cooling System,3.9. Modernization Of The Electrical Installation, 3.10. Modernization Of The Electrical Installation - Installation Of A Photovoltaic Installation Along With Preparation Of A Notification For Connecting The Micro-Installation To The Grid Along With Attachments To The Notification, 3.11. Construction Of A Ramp For People With Disabilities, 3.12. Installation Of A Call System, 3.13. Power Installation, Lightning Protection Installation, Installation Of Equalizing Connections And Grounding. 3.14. Accompanying Works Include: Renovation Of External Stairs, Repainting Of Rooms, Replacement Of Wall And Floor Tiles With Pvc Carpets In Sanitary Facilities, Replacement Of Suspended Ceilings, Cleaning And Painting Of Balustrades On Stairs, Replacement Of Handrails On Internal Stairs, Installation Of New Pvc Floors In Several Rooms, Renovation Of Terrazzo Floors, Dismantling The Existing Buildings In The Corridors And Installing New School Lockers, Installation Of A Kitchenette In The Staff Room, Replacement Of Tin Roofs Over The External Stairs With Glass Roofs And Laying New Roofing Felt Over The Remaining External Roofs Of The Stairs, Delivery And Assembly Of Furniture And Equipment For Rooms 0/1, 0/2, 0/3, 0/4, 0/5, 0/6, 0/7, 0/8, In Accordance With The Interior Design Project Developed By Cc Design Interior Sp. Z O. O - (Appendix No. 8 To The Swz), Installation Of Ball Catches On The Windows In The Gymnasium And Adjustable Basketball Backboards With A Basket, Landscaping, Including: A) Dismantling The Existing Fence With A Wall On The Eastern Side, B) Making A Surface Of Concr