Tenders Are Invited For Road Construction Works – Design And Construction Of The S11 Piła-Poznań Expressway, Section Ujście – Oborniki, Section I Ujście – Budzyń Junction (With Junction)
Tenders Are Invited For Road Construction Works – Design And Construction Of The S11 Piła-Poznań Expressway, Section Ujście – Oborniki, Section I Ujście – Budzyń Junction (With Junction)
Road Construction Works – Design And Construction Of The S11 Piła-Poznań Expressway, Section Ujście – Oborniki, Section I Ujście – Budzyń Junction (With Junction). The Subject Of The Order Is The Design And Construction Of The S11 Expressway On The Section From Km 0+000 To Km Approx. 19+430 (Border Of Plots 184 And 185, Chodzież District, Commune: Budzyń, Wyszyny District) Along With The Connection Of The S11 Road Section To The Existing Dk11 Road (On The Section From Km 18+000 To Km 18+783.01 According To Km From The Study Steś S11 Piła – Ujście). The Beginning Of The Section In Question Is Connecting To The Dual Carriageway Cross-Section Of The Planned S11 Road On The Piła - Ujście Section And Connecting It To The Existing Dk11 Using Design Solutions For The Ujście Junction. The End Of The Section In Question Should Be Connected To The Planned Section Ii, The Budzyń Junction (Without The Junction) - Oborniki (Parkowo). The Planned S11 Piła - Poznań Road On The Ujście - Oborniki Section Is A Fragment Of The S11 Kołobrzeg - Poznań Road. The Length Of The Planned Section Is 20.213 Km. The Investment Is Located In The Northern Part Of The Greater Poland Voivodeship, In The Piła And Chodzież Poviats, Within The Administrative Borders Of The Following Communes: Ujście, Chodzież, Budzyń. The Investment Includes Two Sections: Section A: Connection Of A Section Of The S11 Road To The Existing Dk11 Road (Section Of The S11 Road From Km 18+000 To Km 18+783.01 Using Some Of The Design Solutions For The Ujście Junction According To The Steś Study S11 Piła - Ujście) Along With A Section Of The S11 Ujście - Oborniki Road From Km 0+000 To Km Approx. 0+340 (Boundary Of Plots 418 And 415/2, Piła District, Ujście Commune, District: Wieś Ujska). Section B: Scope Of The Order Beyond Section A. All Necessary Design Studies Must Be Performed, The Necessary Opinions And Technical Conditions Must Be Obtained On Behalf Of And On Behalf Of The Ordering Party, All Arrangements, Permits, Approvals, Decisions And Approvals Necessary For The Performance Of The Contract In Accordance With The Ordering Partys Requirements And The Contract Conditions, Construction Works Must Be Performed And, On Behalf And On Behalf Of The Ordering Party, Decisions On Occupancy Permits Must Be Obtained For The Entire Scope Of The Investment. The Detailed Scope Of The Works To Be Performed As Part Of The Contractors Obligations Is Presented In The Functional And Utility Program (Ffu).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.