1. The Subject Of The Order Includes The Implementation Of A Multi-Discipline Design And Construction And Installation Works In The Design And Build Formula Based On The Functional And Utility Program Entitled Reconstruction And Expansion Of The School And Kindergarten Complex In Czarnocin With Part A, As Part Of The Investment Entitled: Reconstruction Of Part A Of The Zsp In Czarnocin - Revitalization Of Common Space In Czarnocin For Intergenerational Integration And Promotion Of Social Activities, Which Includes: 1) Preparation Of Technical Documentation, Which Includes, Among Others, Detailed Design Studies, Technical Specifications, Cost Estimates; 2) External Works, Which Include The Demolition Of The Building A Together With The Development Of The Area, I.E. Plantings, Construction Of A Parking Lot, Pedestrian Routes And Installation Of Small Architecture; 3) Construction Works Related To The Reconstruction Of The Existing Building A. Construction Works Will Be Related To The Execution Of Earthworks, Foundations, External And Internal Walls, Flat Roofs And Ceilings, Installation Of Window And Door Joinery And Execution Of Plasters, Floors, Wall Cladding And Facades, Construction And Installation Of A Crane; 4) Installation Works Which Include Water And Sewage Installation, Heating Installation With A Heat Source, Ventilation Installation With Heat Recovery, Electrical Installation In Including: Basic And Emergency Lighting, External Lighting, Internal Sockets, Switchboards, Lightning Protection And Equalization Installation, Wlz, Low-Current Installation: Structural, Internet, Telephone, Call, Anti-Burglary And Smart City.2. The Implementation Of The Subject Of The Order Consists Of Two Stages: - Stage 1 - Design - Includes In Particular The Development Of Land Development And Functional-Utility Concepts, Preparation Of A Dc Map. Design, Preparation Of Geotechnical Opinions, Preparation Of An Inventory Of Premises, Construction Designs For All Necessary Industries, Including The Design Of The Necessary Demolition, Executive/Technical Designs For All Required Industries, Necessary Designs For The Construction, Reconstruction Or Decommissioning Of Above- And Underground Technical Infrastructure Devices, Providing Geodetic Studies, Preparation Of Bills Of Quantities And Cost Estimates, Technical Specifications For The Execution And Acceptance Of Construction Works, Information On Safety And Health Protection For Carrying Out The Works, Commissioning Instructions, Operation And Maintenance Instructions, Obtaining Decisions On Cutting Down Trees That Interfere With The Scope Of Works (If Necessary), Obtaining On Behalf Of The Employer A Final Decision On A Demolition Permit (If Required)/Filing A Notification, A Final Decision On The Conditions Of Development And Land Development, A Final Decision On A Building Permit And Making Effective Notifications Of Works For Which A Building Permit Is Not Required. - Stage 2 - Build - Includes The Perform