Quotation are invited for Upgradation of Cable Protection at Various Locations. UPGRADATION OF CABLE PROTECTION AT VARIOUS LOCATIONS AS PER ATTACHEDSCOPE OF WORK, SPECIFICATION AND BOQ.SCOPE OF WORK:IDENTIFICATIO N OF CABLE ROUTE & CABLE TRENCH EXCAVATION (1M WIDTH X 1MDEPTH)1.#CONTRACTOR SHOULD LOOK FOR ANY NEARBY PIPELINE, VALVE CHAMBER,UNDE RGROUND CABLE, OVERHEAD LINE, ROAD CROSSING OR ANY GOVERNMENT ANDPRIVATE PROPERTIES BEFORE EXECUTION OF WORK. IF FOUND, THE CONTRAC TORSHALL IMMEDIATELY INFORM TO THE DEWA REPRESENTATIVE.2.#CONTRACTOR SHALL USE APPROPRIATE MEANS FOR IDENTIFICATION OFEXISTING CABLE ROUTE FROM PUMP HOUSE TO LOCAL STARTER FOR EXCAVATION OFTHE CABLE TRENCH ALONG THE EXISTING CABLE ROUTE BY ONE METER DEPTH X1 M ETER WIDE BY APPROPRIATE MACHINERY.3.#IF ANY CABLE/ ROAD / VALVE CHAMBER / PIPELINE OR ANY OTHERGOVERNMENT OR PRIVATE PROPERTY IS DA MAGED DURING THE WORK, THECONTRACTOR SHALL BE HELD RESPONSIBLE. IN SUCH CASE, THE CONTRACTOR SHALLREPAIR / REPLACE THE SAME AS SOON AS POSSIBLE WITHOUT ANY EXTRA COST TODEWA AND PAY ANY FINES ASSOCIATED WITH THE DAMAGE.4.#ALL POWER CABLES SHALL BE DISCONNECTED FRO M BOTH END AND FIX WARNINGTAG JOINTLY WITH DEWA ENGINEER BEFORE STARTING ANY EXCAVATION.REMOVAL& INSTALLATION OF CABLE, BACK FILLING , COMPACTION & TESTING1.#EXISTING CABLE TO BE REMOVED WITHOUT ANY DAMAGES TO IT AND THE SAMESHALL BE LAY INTO THE NEW CABLE TRENCH A CCORDING TO THE DEWAINSTRUCTIONS/REQUIREMENTS.2.#AFTER REMOVAL OF THE CABLE, THE CONTRACTOR SHALL INFORM DEWAREPRESENTATIVES ABOUT C HECKING, INSPECTION, AND TESTING OF CABLECONDITION PRIOR TO INSTALLATION.3.#BACKFILLING ABOVE THE CABLE WITH AEOLIAN SAND UP TO THE EXISTINGGROUND LEVEL AND INSTALLATION OF WARNING TAPE THROUGHOUT THE CABLE ROUTEIS REQUIRED. AEOLIAN SAND SHALL BE TAKEN FROM THE D EWA SITE.4.# SUPPLY AND INSTALLATION OF SABKHA SOIL ABOVE THE WARNING TAPE BY0.3 METER HIGH X 1 METER WIDE INCLUDING LEVELING AND PR OPER COMPACTIONIS WITHIN THE CONTRACTOR#S SCOPE.5.#DISCONNECTION & RECONNECTION OF THE CABLE FROM LV PANEL AND LOCALSTARTERS, IF NEC ESSARY, SHALL BE WITHIN THE CONTRACTOR#S SCOPE OF WORK.6.#ANY ADDITIONAL WORK(S) REQUIRED SHALL BE SPECIFIED AND INFORMED TODEWA IMM EDIATELY. THE SAME SHALL BE SUBJECT TO INSPECTION AND APPROVAL.7.#AFTER THE CABLE INSTALLATION, THE CONTRACTOR MUST ARRANGE JOINTINS PECTION WITH DEWA ENGINEER TO DETERMINE THE CONDITION OF THE CABLE /EXTENT OF DAMAGE & REPAIR REQUIRED. THE OBSERVED DEFECTS SHALL B E NOTEDAND SIGNED JOINTLY BY CONTRACTOR SUPERVISOR/ REPRESENTATIVE AND DEWAENGINEER AT SITE.8.#DEWA REPRESENTATIVE(S) SHALL BE INFOR MED WHEN THE FINAL INSPECTIONAND TESTING OF THE CABLE IS TO TAKE PLACE. FINAL INSPECTION AND FINALTEST AFTER THE CABLE INSTALLATION/ REPAIR SHALL BE CARRIED OUT INPRESENCE OF DEWA ENGINEERS.9.#LEVELING AND PROPER COMPACTION WITH WATER AND APPROPRIATE MACHINERYSHALL BE WITHIN THE CONTRACTOR#S SCOPE OF WORK. (ARRANGEMENT OF WATERFOR COMPACTION SHALL BE DONE BY THE CONTRACTOR).FOR TECHNICAL CLARI FICATION, PLEASE CONTACT EISSA(
[email protected]) OR VENUGOPAL(
[email protected]). Qty: 4.500 Upgradation of Cable Protection at Various Locations as per attached Scope of Work, Specification and BOQ. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332503318)/$value