Tenders Are Invited For Carrying Out Cmp For Building A Stem Environment According To Procedure Bg-Rrp-1.015 - School. Stem Environment According To Npvurb, As Well As Ongoing Renovations In The Building Of Ou St. Kliment Ohridski, Located In The Residential Area Dr., Pl.
Tenders Are Invited For Carrying Out Cmp For Building A Stem Environment According To Procedure Bg-Rrp-1.015 - School. Stem Environment According To Npvurb, As Well As Ongoing Renovations In The Building Of Ou St. Kliment Ohridski, Located In The Residential Area Dr., Pl.
The Subject Of The Project Is The Repair And Interior Furnishing Of Premises Located On The Second Last Level Of A Building With Identification Number 56722.667.775.5, Located In The Southwest Wing. Functionally, The Floor Is A Corridor Type With Classrooms And Utility Rooms Located On Both Sides. The Premises Are Educational And Do Not Change Functionally, The Disciplines That Will Be Studied In The Classrooms Are Changed, And The Project Creates A Physical Environment For A Stem Center. In The Stem Environment, 1 To 4 Classes Of Children Will Be Taught, Divided Into Groups Of Different Interests - Chemistry And Physics, Biology, Technology, Engineering And Mathematical Thinking. The Premises Subject To The Project Have An Area Of 418 Sq.M. Conditions Are Being Created In The Center To Educate 120 Children And 4 Teachers. Functionally, There Are Four Large Classrooms, One Smaller Office And Auxiliary Rooms To The Offices. In Two Of The Rooms, A Thin Wall Is Removed And A Common Office Room Is Set Aside For A Biology Classroom. Three Of The Existing Doors Are Walled Up And Two New Doors Are Opened. In The Two Offices Of Chemistry And Biology, The Doors To The Storage Rooms Are Removed And Their Openings Are Widened. The Corridor Is Defined As A Combined Communicative Space For Organizing Activities Such As Rest, Reading, Games And Social Communication. In One Of The Rooms, A Niche Opens To The Corridor, In Which There Are Places To Sit. Remove Existing Flooring Including Screeds. Mild Paint Is Scraped Off The Walls. New Perlite Screed Is Being Applied And The Finish Is Being Sanded So That The New Vinyl Flooring Can Be Installed Without Thresholds, Teeth And Obstructions In All Rooms. The Vinyl Flooring With High Wear Resistance Min. 2Mm Thickness In Colors As In The Rendered Visualizations. A Dark Gray Graphite Holker 10 Cm Is Provided For The Vinyl Flooring. In The Two Offices Of Physics And Chemistry And Biology, It Is Planned That The Study Tables Will Be Supplied With Electricity And Plumbing. Given That It Is Necessary To Provide A New Double Floor With Metal Legs In The Biology Hall, The Height Of The Floor Will Be 22 Cm From The Main Floor. All Existing Flooring And Screed In The Room Must Be Removed Beforehand. Given The Rise In The Level In The Room, It Is Imperative To Install Metal Railings On The Outside Of The Windows. In The Physics And Chemistry Room, It Is Also Planned That The Study Tables Will Be Supplied With Electricity And Plumbing, As The Selected Model Tables Are Rectangular In Shape, They Will Be Placed Close To Each Other And An Installation Box With A Height Of About 50 Cm Will Be Made. It Is Planned That The Box Will Be Covered With Hpl Boards, Even In The Western Part Of The Room It Can Be Used For Sitting By The Students. New Flooring, Wall Coverings, New Lighting Fixtures Are Planned For All Rooms.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.