Tenders Are Invited For Renovation Of The Surface Of Provincial Road No. 265 - Roundabout. Higersbergers From Al. Mikołajczyka From Km 43+252 To Km 43+863 In The Town Of Gostynin - Procedure No. 285/25
Tenders Are Invited For Renovation Of The Surface Of Provincial Road No. 265 - Roundabout. Higersbergers From Al. Mikołajczyka From Km 43+252 To Km 43+863 In The Town Of Gostynin - Procedure No. 285/25
1. The Subject Of The Order Is: Renovation Of The Surface Of Provincial Road No. 265 - Roundabout. Higersberger From Al. Mikołajczyka From Km 43+252 To Km 43+863 In The Town Of Gostynin - Procedure No. 285/25.2. A Detailed Description Of The Subject Of The Order Can Be Found In The Tender Documentation (Part Iii Of The Swz) And In The Bill Of Quantities (Part Iv Of The Swz). The Contractor Is Obliged To Ensure, At Its Own Expense, Safe Road And Pedestrian Traffic Conditions In The Area Of Works Covered By The Contract On The Basis Of A Traffic Organization Design For The Duration Of Construction Prepared By And At The Contractors Expense.3. If Trademarks, Patents Or Origin, Source Or Specific Process That Characterize The Product Or Services Provided By A Specific Contractor Are Indicated In The Description Of The Subject Of The Order, The Ordering Party Allows Equivalent Solutions. If The Description Of The Subject Of The Order Refers To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems, The Ordering Party Allows Solutions Equivalent To Those Described.4. The Contractor Is Obliged To Have A Civil Liability Insurance Policy (Oc) For Damage Caused During The Performance Of The Contract To The Subject Of The Contract And To Third Parties For The Entire Duration Of The Contract And For A Guarantee Sum Not Lower Than Pln 1,000,000.00.1) The Contractor Is Obliged To Provide The Ordering Party With A Copy Of The Current And Paid Policy Within 14 Days From The Date Of Conclusion Of The Contract. Provided That Continuity Of Insurance Is Maintained, The Ordering Party Allows The Possibility Of Presenting Several Policies Confirming The Possession Of Insurance (Oc) During The Duration Of The Contract, Covering The Entire Period Of The Contract.2) The Contractor Is Obliged To Provide The Ordering Party With A Copy Of Another Current, Paid Policy Within 7 Days From The Expiry Of The Previous Policy. If The Contractor Fails To Fulfill The Above Obligation, The Ordering Party Will Charge The Contractor Contractual Penalties For Delay In The Amount Specified In The Contract.3) If The Contractor Fails To Submit A Copy Of A Current And Paid Insurance Policy (Oc) Within 14 Days From The Date Of Conclusion Of The Contract, The Ordering Party Will Have The Right To Withdraw From The Contract For Reasons Attributable To The Contractor.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.