1) The Subject Of The Order Is The Modernization Of The Water Treatment Plant In Borowa Góra Commune. Serock, On Plots No. 94/29 And 221/1. 2) The Order Is Carried Out In The Design And Build Formula. 3) The Area For The Investment In The Reconstruction Of The Water Treatment Plant In Borowa Góra Is Plot 94/29, 221/1 Within 03 Borowa Góra, Commune. Serock, Fenced And Covered With Grass. Access Is Provided By A Municipal Road With An Asphalt Surface, Ul. Lipowa - Plot No. 197/2. The Plot Includes A Water Pumping Station, Two Deep Wells, And Two Expansion Tanks With A Capacity Of 125 M3 Each And Technical Underground Infrastructure.4) The Contractors Task Will Be To Develop Design Documentation Covering The Scope Of Construction Works Included In The Functional And Utility Program, Including In Particular: - Construction Of A Water Treatment Plant With Technology With A Capacity Of 50 M3/H (Construction Of The Building And Delivery And Installation Of Technological Equipment); - Construction Of An Expansion Tank With A Capacity Of Usable Area Of 200 M3 And Total Area Of 229 M3; - Construction Of A Backwash Settling Tank; - Construction Of Underground Water Supply, Sewage And Electrical Installations Between Facilities; - Implementation Of A Visualization System For Technological Processes; - Construction Of Access Roads To Individual Facilities; - Commissioning And Putting Into Operation A Water Treatment Plant; - Dismantling Works Of Existing Technological Equipment - Hydrophore Set, Sodium Hypochlorite Dosing Pump And Installation Of New Devices In Accordance With The Provisions Pfu; - Performance Of Necessary General Construction Renovation Works Of The Existing Pumping Station Building; - Reconstruction Of Deep Well Casings Into Laminate Casings With Equipment; - Replacement Of Necessary Electrical Installations In The Existing Building; And Implementation Of Construction Works Based On The Developed Design Documentation. 5) Scope Of The Order: - Preparation Of Construction Designs And Obtaining For Them The Following Regulations: Opinions, Consents, Arrangements And Permits, Along With A Decision Authorizing The Commencement Of Construction Works On A Water Treatment Plant Borowa Góra Together With The Necessary Technical Infrastructure, - Conducting Ground Tests, - Surveying Services, - Preparing Technical Designs In Accordance With Applicable Law, - Carrying Out Construction And Assembly Works Based On The Designs, - Conducting The Required Tests And Examinations And Preparing Documents Related To Putting The Facilities Into Operation And Use, - Designers Supervision, - Ensuring A Guarantee Of Proper Performance Of The Works. - Obtaining A Decision On The Use Permit Or A Notification Of Completion Of Construction Works Accepted Without Any Reservations By The Competent Construction Supervision Authority.6) The Remaining Description Of The Subject Of The Contract Is Included In The Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.