1. The Subject Of The Order Is The Modernization Of Water Supply Infrastructure In The Turobin Commune As Part Of The National Reconstruction And Resilience Plan, Investment: B3.1.1. Investments In Sustainable Water And Sewage Management In Rural Areas. 2. The Form Of The Order Is The Design And Execution Of Construction Works Within The Meaning Of The Act Of July 7, 1994 - Construction Law. The Ordering Party Describes The Subject Of The Order Using A Functional And Utility Program. The Subject Of The Order Is Design, Including The Performance Of All Design Works, Obtaining Permission To Implement The Investment, Obtaining Other Legally Required Decisions, Permits, Notifications, And Then Performing Construction Works And Exercising Authors Supervision Over The Entire Investment During Its Implementation. 3. The Subject Of The Order Includes: 1) Task No. 1 - Reconstruction And Expansion Of The Water Intake In The Town Of Żurawie: - Modernization Of The Existing Water Supply Station Building, Well Shafts, Fence And Gate, - Reconstruction Of The Water Station Along With The Construction Of A Retention Tank With V = 250 M3, - Replacement Of Deep-Well Pumps Along With The Replacement Of Pump Pipes And Construction Of Surface Casings, - Construction Of New Piping In The Water Station Area, - Execution Automation Installation Controlling The Operation Of The Station, - Execution Of All Internal Installations In The Station, - Delivery And Installation Of Station Equipment, - Delivery And Installation Of A Hydrophore Set, - Delivery Of A 60 Kw Power Generator Along With The Expansion Of The Electrical Installation To Adapt It To Work With An Electric Generator, - Delivery And Installation Of A Uv Sterilizer In The Building2) Task No. 2: Construction Of The Gaj Czernięciński - Wólka Czernięcińska Water Supply Network: - Construction Of A New Water Supply Network Pe 100 Rc Dn160 Sdr17 With A Length Of Approx. 3588 M Using The Trenchless Method (Directed Drilling),3) Task No. 3: Delivery And Installation Of Water Meter Sets With Remote Reading Together With Remote Reading Software: - Delivery And Assembly Of Water Meter Sets With A Remote Reading System Should Be Performed In The Amount Of 574 Pieces4. A Detailed Description And Scope Of Design And Construction Works Is Presented In Annex No. 10 To This Swz - Functional And Utility Program And In Annex No. 11 To The Swz - Documentation Constituting An Integral Part Of The Swz.5. Attention !!! Mandatory Local Visition 1) The Ordering Party Requires An On-Site Inspection Of The Subject Of The Order For Contractors Interested In Submitting An Offer; The On-Site Visit Is Intended To Familiarize The Contractor With The Specific Nature Of The Subject Of The Order, Including The Conditions For Its Implementation; 2) Each Contractor Should Set The Date Of The On-Site Visit Individually, Bearing In Mind That The Visits Can Only Be Carried Out In The Presence Of The Employers Employees And On Dates Agreed In Advanc
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.