1. The Subject Of The Order Includes: 1.1. Maintaining The Patency Of The Storm Sewerage Network With Diameters From Dn50 To Dn1800, Including Its Infrastructure, Continuously, I.E. Around The Clock, Ensuring Proper Operation Of The Network, Including Work Related To Maintenance, Cleaning, Video Monitoring, Removal Of Failures And Proper Functioning Of The Network Owned By The Dąbrowa Górnicza Commune, Excluding The Internal Sewage Network Located In Closed Facilities Such As Schools, Kindergartens, Hospitals, Plants, Markets, Guarded Parking Lots, Sewage Sections Belonging To The Multi-Family Housing Administration (Cooperatives, Communities, Mzbm) And Sections Constituting Local Drainage (Roads, Squares). The Length Of The City Storm Sewage System Is Approximately 228 Km. Together With Facilities, In Particular 9 Rainwater Pumping Stations, 10 Retention Reservoirs, 91 Outlets. 1.2. Ensuring Ongoing Documentation And Technical Service In Accordance With Applicable Regulations.1.3. Detailed Provisions Regarding The Subject Of The Contract Are Included In Paragraphs 5, 6 And 7 Of The Draft Contract Constituting Annex No. 6 To The Specification Of The Terms Of The Contract - Including Those Relating To: • Works That Do Not Require Immediate Intervention - Paragraph 6, Paragraph 1 Of The Draft Contract; • Works Related To The Reconciliation Of Documentation - Paragraph § 6, Paragraph 7 Of The Draft Contract; • Operational Works - Paragraph 6, Paragraph 8 Of The Draft Contract; • Actions In Emergency And Crisis Situations - Paragraph 7, Paragraph 7 Of The Draft Contract;• General Obligations Of The Contractor - Paragraph 5 Of The Draft Contract.1.4. The Contractor Is Obliged To Have A Material And Equipment Base In The Dąbrowa Górnicza Commune Or At A Distance No More Than 10 Km From The City Limits, And If It Does Not Have Technical Resources, To Create A Base And Document It Within 10 Calendar Days From The Date Of Signing The Contract. 2. The Subject Of The Order Must Be Implemented In Accordance With: 1. Act Of September 13, 1996 On Maintaining Cleanliness And Order In Municipalities2. Act Of 20 June 1997 Road Traffic Law;3. Act Of July 7, 1994 Construction Law;4. Act Of December 14, 2012 About Waste; 5. Regulation Of The Minister Of Labor And Social Policy Of September 26, 1997 On General Occupational Health And Safety Regulations;6. Regulation Of The Minister Of Infrastructure Of July 3, 2003 On Detailed Technical Conditions For Road Signs And Signals As Well As Road Traffic Safety Devices And The Conditions For Their Placement On Roads;7. Order No. 1686.2021 Of The Mayor Of Dąbrowa Górnicza Of April 7, 2021 Regarding: Protection Of Trees On The Construction Site, Published At: Https://Www.Bip.Dabrowa-Gornicza.Pl/5839/Dokument/148697 Note: Whenever In The Content Of This Specification Of Terms Of Order (Hereinafter: Swz) And Its Annexes, Including The Draft Contract Indicates Legal Acts, It Should Be Assumed That They Were Referred To In The Wo
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.