e05 Side Road Measure Kildalkrysset-Roa Station . Descriptiontodays Roalinna, On The Stretch Between Kildalbygget And Roa Station, Does Not Have Satisfactory Road Standards, Neither In Terms Of Traffic Management Nor Traffic Safety. A New Continuous Pedestrian Connection Between The Center And The Station And A New Pavement Around The Kildal Building Must Therefore Now Be Established And Built. Road Accessibility In The Planning Area Is Poor In Places. The Stretch Of Road Is Narrow And Winding On Parts Of The Stretch, And Has Many Unclear Exits, And Currently Lacks A Solution For Pedestrians And Cyclists Along Roalinna. Roalinna Runs In An Arc From And To Hadelandsvegen Via Roa Station. The Stretch From Kildalkrysset To Roa Station Is A County Road With An Ådt Of Just Over 700. Todays Speed Limit Is 40 Km/H On The Stretch With The Exception Of The Station Area, Which Has 30 Km/H. The Undertaking Includes The Following Main Works: • Establishment Of A New Pavement Along Fv.2300 Including Kerbing, As Well As The Establishment Of Some Other Short Stretches Of Road. • Establishment Of Raised Pedestrian Crossings (Walkways), Including Tactile Marking. • Establishment Of Kerbside Stops At Nordliagutua. • New Lighting System, Including Distribution And Control System. • New Storm Water System, With Replacement And Adjustment Of The Existing Storm Water System On The Entire Stretch. • Landscaping Work Such As The Establishment Of Retaining Walls, Kerbstones. • Minor Municipal Va Works, Both New Sumps And Lines And Adjustment And Adaptation Of Old Sumps And Lines
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.