The Profile School Forms The School Center With The Cafeteria And The Sports Hall As Well As The Sports Facilities. It Was Built Between 1963 And 1971, Expanded Several Times And Used By A Secondary School For A Long Time. With The Closure Of The Secondary School On July 31, 2016, The New Type Of School (Profile School) Uses The Former Buildings. In Order To Concentrate The Profile School Location In Ascheberg, The Former Secondary School In Herben Will Be Abandoned. To Achieve This, The Existing Buildings Must Be Expanded, Converted And Renovated. The New Location Will Consist Of Three Buildings (House A (2), House B (3) And House C (1)) Plus A Light-Weight Farm Building. After Completion Of The Measure, House A (2) Will Be A Renovated Existing Building, House C (1) And House B (3) Will Each Be A New Building. The Subject Of The Construction Work Advertised Here Is The Installation Of Building Automation In House B And House C.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.