Refurbishment Work – Pv Accident/Reconstruction Works 2025-2027. Carrying Out Emergency/Reconstruction Construction Works Of The Drinking Water Network And Sewage Network And Its Facilities Under The Management Of Pannon-Víz Zrt. Pannon-Víz Zrt. Provides Water Utility Services In 121 Settlements In Its Operating Area. The Sewage Network Is Not 100% Complete. Out Of 121 Settlements, 97 Settlements Have Sewage Networks. The Waste Water Drainage Systems Of The Settlements Are Divided Into 17 Water Utility Systems. The Vast Majority Of Pipe Materials Are Plastic And Concrete, With A Smaller Percentage Of Asbestos Cement, Stone Clay And Steel Pipes. The Tenderer Determines The Breakdown Price Or The Concept Of Reconstruction: Accident: An Event That Cannot Be Planned In Advance During The Operation Of The Facilities, Which Must Be Avoided In Order To Continue Providing Services. Reconstruction: Completing The Tasks Included In The Companys Approved Gft Plan Or Its Amendment. Sewage Sewer Emergency/Reconstruction With An Estimated Length Of 1,117 Fm Drinking Water Pipeline Emergency/Reconstruction With An Estimated Length Of 804 Fm Framework Contract Scope: From The Entry Into Force Of The Contract In 2026 Until The Available Net Amount Of Huf 500,000,000 Is Exhausted, But Until December 31, 2027 At The Latest. The Customer Undertakes To Order Up To 70% Of The Total Amount. The Detailed Task Description Is Included In The Technical Description. The Works Are Ordered On The Basis Of The Given Unit Prices, Within The Framework Of Full-Scale Task Execution According To The Rules Of The Profession.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.