The Subject Of The Order Is The Reconstruction Of A Bridge Structure Along The District Road No. 1225 O Km 0+175 In The Town Of Baborów In The Design And Build Formula. As Part Of The Implementation Of The Subject Of The Order, The Contractor Will Be Obliged To Prepare On Its Own, Among Others: 1) Maps For Design Purposes Along With Designs For The Division Of Plots Necessary For The Implementation Of The Investment, 2) Research On The Geological Subsoil (If It Is Necessary To Extend The Research Compared To The Research Carried Out As An Annex To The Fup), 3) Information Card For The Project Together With Obtaining An Environmental Decision, 4) Water Law Study Together With Obtaining A Water Law Decision, 5) Land Development Design, 6) Architectural And Construction Design, 7) Technical Design,8) Executive Design,9) Industry Designs,10) Technical Specification For The Execution And Acceptance Of Construction Works,11) Temporary And Permanent Traffic Organization Design,12) Other Studies Resulting From The Scope Of The Designed Works,13) Obtaining A Building Permit Or Zrid Decision,14) Developing A Health And Safety Plan,15) Developing A Work Schedule,16) Developing A Quality Assurance Program (Pzj),17) Ensuring The Necessary Surveying Services To Carry Out The Task, Develop Geodetic Documentation With An As-Built Inventory And Provide The Ordering Party With A Copy Of The Master Map Created As A Result Of The As-Built Geodetic Inventory, Accepted Into The State Geodetic Resource And Classified,18) Preparing Photographic Documentation Of The Course Of Works (1 Copy Of Cds, Provided With The As-Built Documentation). As Part Of The Implementation Of The Subject Of The Order, The Contractor Will Be Obliged To Perform, On Its Own, The Following:1) Cutting Down Trees Colliding With The Scope Of Works,2) Securing (Relocating) Colliding External Devices,3) Demolition Of The Existing Bridge Structure And Its Equipment,4) Demolition Of The Retaining Wall (Right Bank) From The Downstream Side To The Extent Colliding With The Designed Bridge Structure,5) Securing Excavations By Using Steel Sheet Piling (Lost Walls),6) Intermediate Foundation (Piles),7) Test Loading Of Piles,8) Bodies Abutments With Wings (Retaining Walls),9) Backfills,10) Installation Of Prefabricated Load-Bearing Structure Elements (The Load-Bearing Structure Can Be Made In The Form Of A Monolithic Reinforced Concrete Frame),11) Transition Slabs,12) Insulation,13) Installation Of Stone Curbs,14) Sidewalk Caps,15) Installation Of Traffic Safety Elements (Barriers, Handrails, Balustrades),16) Laying Of The Surface Bituminous (Including Poured Asphalt As A Binding Layer On A Bridge Structure),17) Expansion Joints (Continuation Of The Surface),18) Resin Surface Of Sidewalks (The Use Of Surfaces Based On Bituminous Emulsion Modified With Polymers Is Allowed),19) Protection Of Concrete Surfaces With Protective Coatings For Concrete,20) Drainage,21) Reinforcements Within Slope Cones Using Granite