Part I - Energy Modernization Of The Volunteer Fire Department Building In Wysoka Wielka.1. The Subject Of The Order Is The Performance Of Construction Works Related To The Energy Modernization Of Buildings Of The Volunteer Fire Departments In The Kutno Commune.2. The Detailed Scope And Description Of The Subject Of The Order Are: 1) For Part I - Energy Modernization Of The Volunteer Fire Department Building In Wysoka Wielka: A) Construction Design - Construction Industry - Annex No. 1A To The Swz; B) Technical Design - Construction Industry - Annex No. 1B To The Swz; C) Technical Specification For The Execution And Acceptance Of Construction Works - Construction Industry (Hereinafter Also Referred To As Stwiorb /Sst) - Annex No. 1C To Swz;D) Construction Design - Electrical Industry - Annex No. 1D To Swz;E) Technical Specification For The Execution And Acceptance Of Construction Works - Electrical Industry (Hereinafter Also Referred To As Stwiorb /Sst) - Annex No. 1E To Swz;F) Bill Of Quantities - Construction Industry - Annex No. 1F To Swz; (Note: Due To The Lump-Sum Nature Of The Remuneration, The Ordering Party Provides The Bill Of Quantities As Illustrative And Informational Materials)G) Bill Of Quantities - Electrical Industry - Annex No. 1G To The Swz; (Note: Due To The Lump-Sum Nature Of The Remuneration, The Ordering Party Provides The Bill Of Quantities As Illustrative And Informational Materials)H) Draft Contract, Constituting Annex No. 5A To The Swz.3. With Respect To Part I - Energy Modernization Of The Volunteer Fire Department Building In Wysoka Wielka, The Subject Of The Order Does Not Include The Stage Specified In The Design Documentation - Entrance Roofing.4. Guarantee And Warranty For Defects:1) The Ordering Party Requires The Contractor To Provide A Guarantee And Warranty For Defects For The Completed Construction Works For A Period Of At Least 36 Months From The Date Of Final Acceptance Of The Works. (The Final Date Of The Warranty And Warranty For Defects Will Result From The Contractors Offer).2) The Warranty And Warranty Covers All Elements Performed By The Contractor As Part Of The Execution Of The Order In Question, In Particular: A) Works Construction;B) Electrical Works;C) Assembly Works;D) Installations Performed;E) Delivered And Installed Devices.3) The Warranty Covers: A) Removal Of All Defects Present In The Item At The Time Of Receipt As Well As Those Arising During The Warranty Period; B) All Costs Related To The Performance Of Warranty Repairs, In Particular Costs Of Materials And Labor As Well As Costs Of Travel To The Place Of Repair, Transport And Delivery Of Construction Products; C) Costs Of Removing All Damages, Defects And Faults That Arose As A Result Of Materials Used By The Contractor That Have A Hidden Defect.5. Information About The Local Visition: Contractors May Become Acquainted With The Conditions Of Contract Execution At The Place Of Performance Of Construction Works After Prior Notification To
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.