Tenders Are Invited For Execution Of Construction And Assembly Works For Site: External Heat Supply And Subscriber Stations For Multi-Family Residential Buildings With Shops, Underground And Above-Ground Garages - Block A, Block B And Two Sheds Over Garage Ramps - Phased Implementation. First Stage: Block A, Ground Floor And Underground Floor Of The Two Blocks With The Necessary Deviations For Bl. B, ... Continued In Additional Information(Bt-300-Lot)
Tenders Are Invited For Execution Of Construction And Assembly Works For Site: External Heat Supply And Subscriber Stations For Multi-Family Residential Buildings With Shops, Underground And Above-Ground Garages - Block A, Block B And Two Sheds Over Garage Ramps - Phased Implementation. First Stage: Block A, Ground Floor And Underground Floor Of The Two Blocks With The Necessary Deviations For Bl. B, ... Continued In Additional Information(Bt-300-Lot)
The Scope Of The Public Procurement Includes Activities For The Implementation Of Construction And Assembly Works (Smr), Which Are Carried Out In Accordance With Part Three Construction Of The Law On Territorial Development (Zut). The Object Of The Smr: External Heat Supply And Subscriber Stations For Multi-Family Residential Buildings With Shops, Underground And Above-Ground Garages - Block A, Block B And Two Sheds Over Garage Ramps - Phased Implementation. First Stage: Block A, Ground Floor And Underground Floor Of The Two Blocks With The Necessary Deviations For Bl. B, Entrance/Exit To The Property, Sheds Over The Garage Ramps, Landscaping And Landscaping Of The Adjacent Grounds. Second Stage: Block B, Located In The Pi With Identifier 68134.2820.1344, Upi V - 1344, Quarter 33, Vrabnitsa District - 1, So - Vrabnitsa Area, Is A Third Category Of Construction, According To Article 137, Paragraph 1, Item 3 Of The Zut. The Construction Falls In The Third Group, According To The Rules For The Order Of Entry And Maintenance Of The Central Professional Register Of The Builder. The Circumstances Related To The Initiation, Implementation And Acceptance Of Smr, And Putting The Site Into Operation Are Certified By Drawing Up And Signing By The Participants Of The Relevant Acts And Protocols In Accordance With Ordinance No. 3 Of 31.07.2003 On Drawing Up Acts And Protocols During Construction. The Technical Execution Of The Construction Must Be Carried Out In Accordance With The Requirements Of The Applicable Regulations, Including The Zut And Its Subsidiary Regulations; The Technical Specifications Of The Construction Products, Materials And Equipment Used In The Construction And The Minimum Requirements For Health And Safety Working Conditions When Performing Smr. Detailed Information On The Requirements For The Implementation Of The Public Procurement Are Contained In The Technical Specification Attached To The Public Procurement Dossier. The Types Of Construction And Assembly Works That Are Subject To Execution And Their Quantities Are Described In The Bill Of Quantities Attached For Valuation According To The Model And Investment Project. The Drawings, Part Of The Investment Project, Contain Additional Information About The Specifics Of The Specific Object. The Scope Of The Public Procurement Includes Activities For The Implementation Of Construction And Assembly Works (Smr), Which Are Carried Out In Accordance With Part Three Construction Of The Law On Territorial Development (Zut). The Scope Of The Public Procurement Includes Activities For The Implementation Of Construction And Assembly Works (Smr), Which Are Carried Out In Accordance With Part Three Construction Of The Law On Territorial Development (Zut).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.