Construction Work – Sewer And Road Construction Work, Empty Pipe Laying Work, Eppendorfer Straße. Approx. 900 M Of Reinforced Concrete Pipes Dn 300 To Dn 700 750 M Pvc - U - Pipes Dn / Od 315-400 2 Pieces Of Rainwater Retention Structures Made Of Reinforced Concrete Frame Elements (Approx. 510 M³ And 290 M³) 2 Pieces Of Rainwater Purification Systems Dn 2200 Stb And Dn 2600 Pp Are Used 12 Pieces Of Combination Shaft Structures For Mixed Water And Rainwater 12 Pieces Of Standard Shaft Structures Dn 800 To Dn 1500 15,000 M³ Soil Excavation Up To A Depth Of Approx. 6.00 M 7,650 M² Construction Pit Shoring Up To A Depth Of Approx. 6.00 M 5,500 M³ Filling With Zfsv (Liquid Soil) 5,700 M² Full Asphalt Belkl Road Expansion. 3.2 And Belkl. 1.0 6,300 M² Full Pavement Expansion
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.