Railway Construction Works – Track Elevations On The Eastern Branch And Plugs Pfa I + Ii. The Following Service Description Includes The Tender For The Higher Tamping Or Adjustment Of The Tracks In The Mettmann Stadtwald Station, Hp Neandertal And Hp Erkrath Nord, As Well As The. Afterwards, Tamping Runs Over The Entire Route. The Planned Track Adjustments To The Platforms And The Electrification Are On Route 2423 (Düsseldorf-Gerresheim - Dornap-Hahnenfurth) And Extend To The Higher Tamping Of The Tracks At The Stops Erkrath (Approx. Km 8.3 To Km 8.6), Neandertal (Approx. Km 11.5 To Approx. Km 11.8), Mettmann Zentrum (Approx. Km 14.8 To Km 14.95) And Mettmann Stadtwald (Approx. Km 15.3 To Km 15.6). This Enables Accessibility At The Edge Of The Platform. The Existing Route Is Not Electrified And Is Operated By Regiobahn Fahrbetriebsgesellschaft Mbh In S-Bahn Operations Every 20 Minutes On Mondays - Fridays Until 8 P.M., And Every 30 Minutes Thereafter And On Weekends. The Line Speed Is 80 Km/H.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.