1. The Subject Of The Order Are Construction Works Consisting In The Construction Of The Kiełczów Bypass Along Ul. Kawowa Together With The Construction Of A Road For Pedestrians And Bicycles In The Town Of Kiełczów.2. The Scope Of The Order Includes: 1) Construction Works Involving The Construction Of The Kiełczów Bypass Along Ul. Kawowa Together With The Construction Of A Road For Pedestrians And Bicycles In The Town Of Kiełczów Stage I Together With The Elimination Of Conflicts With The Sanitary Network And The Elimination Of Conflicts With The Power Grid On The Section From Ul. Wiśniowa Km 1+939.60 To Ul. Łąkowa Km 2+787 (In The Area Of Plots No. 341/2, 374/2, Mirków District, 89/338, 510/2, 89/335, 78/2, 77/2, 76/2, 75/2, 74/2, 73/2, 72/2, 71/2, Kiełczów District) With A Surface Of Asphalt Concrete, In Particular: A) Execution Of Preparatory, Demolition And Earthworks Within The Road, B) Removal Of Trees And Bushes, C) Construction Of A 6.0 M Wide Road On Both Sides With Curbs And Widening On Curves, D) Construction Of A 3.0 M Wide Pedestrian And Bicycle Path Located Behind The Green Belt, E) Construction Of Intersections With Municipal Roads And With Access Sections, F) Construction Of Individual Exits To Individual Plots, G) Construction Of Culverts And French Drainage, H) Reconstruction Of The Network Related To The Removal Of Conflicts With The Existing Telecommunications Infrastructure Network, I) Cabling Of Two Medium-Voltage Power Grids Across The Width Of The Road, J) Construction Of Lawns On The Undeveloped Area, K) Execution Of Vertical Adjustments Of Manholes, Manholes, L) Protection Of Existing Networks, M) Execution Plantings,N) Designing, Agreeing, Placing Temporary Traffic Organization In The Area And Implementing It In Accordance With § 12 Section 1 Of The Regulation Of The Minister Of Infrastructure Of September 23, 2003 On Detailed Conditions For Road Traffic Management And Supervision Over This Management (Consolidated Text: Journal Of Laws Of 2017, Item 784), O) Designing, Agreeing And Implementing The Target Traffic Organization In The Field And Implementing It In Accordance With § 12 Section 1 Of The Regulation Of The Minister Of Infrastructure Of September 23, 2003 On Detailed Conditions For Road Traffic Management And Supervision Over This Management (Consolidated Text: Journal Of Laws Of 2017, Item 784);2) Construction Works Consisting In Removing The Collision Of A Medium Voltage Power Line With The New Road System: A) Sn-1 Collision - 20 Kv Mv Overhead Line L-113B) Collision Sn-2 - 20 Kv Mv Overhead Line L-11143) Construction Works Consisting In The Construction Of Road Drainage (Rainwater Sewerage) On The Section From Km 1+939.60 To Km 2+787, Connected To The Existing Stormwater Collector In Ul. Łąkowa, 4) Construction Works Consisting In Removing Interference With The Sanitary Sewage Network, Including In Particular The Construction Of A Technical Channel Under The Designed Road Within Ul. Wiśniowa (In The Area O