Tenders Are Invited For Reconstruction, Modernization And Adaptation Of The Building At Ul. Piwna 8A For The Operation Of The District Office In Zduńska Wola
Tenders Are Invited For Reconstruction, Modernization And Adaptation Of The Building At Ul. Piwna 8A For The Operation Of The District Office In Zduńska Wola
The Subject Of The Order Is The Reconstruction And Thermal Modernization Of The Building At Ul. Piwna 8A For The Needs Of The Functioning Of The District Office In Zduńska Wola Together With The Delivery And Installation Of The First Equipment And Land Development. The Building Will Be Equipped With Internal Installations, I.E. Electrical, Sewage, Domestic Water And Fire Protection Installations, Central Heating From The Heating Network, Mechanical Ventilation With Heat Recovery, Air Conditioning In The Scopes Specified In The Design Documentation, Technical Specifications For Construction And Acceptance Works, Energy Audit Of The Building And In The Description Of The Subject Of The Order (Opz). A Detailed Description Of The Subject Of The Order Is Included In The Following Annexes: 1) Annex No. 2 To The Swz - Description Of The Subject Of The Order (Opz): 2) Annex No. 5 To The Swz - Design Documentation - The Design Documentation Includes: A) Construction Design, Including: - Architectural And Construction Design, - Land Development Design, - Technical Designs, - Executive Designs, - Design Interior Design, - Greenery Design, - Bills Of Quantities (The Bills Of Quantities Attached To The Swz Are For Information Purposes Only. After Reading The Design Documentation And Other Documents, The Contractor Is Obliged To Determine The Scope Of Works Necessary To Achieve The Result), - Ornithological And Chiropterological Expertise - Update Of December 5, 2025 - Decision On The Building Permit No. 375.2023, Sign As.6740.1.261.2023 Of November 8, 2023, B) Energy Audit Of The Building, 3) Annex No. 6 To Swz - Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb). 5. The Subject Of The Order Is Divided Into The Following Implementation Stages: 1) Stage I - It Includes The Execution Of The Subject Of The Order In An Amount Corresponding To The Value Of 40% Of The Gross Remuneration Of The Entire Order, Which Is Advancement Of Construction Works At The Level Of At Least 40% Of The Contract Value;2) Stage Ii - Includes The Execution Of The Subject Of The Contract In An Amount Corresponding To The Value Of 40% Of The Gross Remuneration Of The Entire Order, Which Constitutes The Advancement Of Construction Works At The Level Of At Least 80% Of The Contract Value;3) Stage Iii - Includes The Execution Of The Subject Of The Contract In An Amount Corresponding To The Value Of 20% Of The Gross Remuneration Of The Entire Order, Which Constitutes The Advancement Of Construction Works At The Level Of At Least 100% Of The Value Of The Order Include In Particular Internal Finishing Works And The Purchase, Delivery And Installation Of Equipment.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.