Tenders Are Invited For Civil Engineering Consultancy Services – Project Management Dstw Koblenz-Trier Expansion Stage

Tender Detail

106319114
835235-2025
Self-Funded
Tenders Are Invited For Civil Engineering Consultancy Services – Project Management Dstw Koblenz-Trier Expansion Stage
NCB
Western Europe
European Union,G20
12-01-2026

Work Detail

Civil Engineering Consultancy Services – Project Management Dstw Koblenz-Trier Expansion Stage. The Signal Box Technology That Exists On Route 3010 From Km 37.680 To Km 53.880 Is Missing And Is To Be Replaced By The New Dstw Technology. In The Area Of ​​The Expansion Of The 1St Construction Stage In The Dstw Koblenz - Trier, The Operating Stations Hp Pommern, Hp Klotten, Bf Cochem And The Bft Ediger-Eller Are Located On The Double-Track, Electrified Main Line 3010. The Expansion Stage Of The First Construction Stage Is Part Of The Pre-Series Project Of The Dstw Koblenz-Trier And Will Be Put Into Operation Together With The First Construction Stage In December 2029. As Part Of The Nationwide Rollout Of Digital Interlocking Technology (Dstw), The Existing, Out-Of-Date Interlocking Technology On Route 3010 In The Section Between Km 37.680 And Km 53.880 Will Be Replaced By Modern Dstw Technology. The Implementation Takes Place As Part Of The Expansion Of The First Construction Stage Of The Pre-Series Project Dstw Koblenz–Trier (Dstw Kotr). The Technology Location And The Operating Location Are Located At Wittlich Train Station (In The Area Of ​​The First Construction Stage). The Control Units For The Operating Points In Treis-Karden, Cochem And The Free Route From Cochem And Bullay Are Carried Out By The Track Field Concentrators In The Respective Operating Points. Project Scope And Location The Project Area Extends Along The Double-Track, Electrified Main Line 3010 Between The Operating Locations: Pommern Stop Klotten Stop Cochem Train Station (Sp Dr S60) Ediger-Eller Train Station Treis-Karde Train Station (Dr S2) Part Of The Project Area Are: The Existing Cochem And Treis-Karden Train Stations The Kaiser Wilhelm Tunnel A Total Of Five Level Crossings, Which Are New As Part Of The Dstw Integration Need To Be Connected Or Adjusted. The Technical Supplier Is Hitachi Rail (Formerly Thales), Which Was Commissioned To Provide The Equipment As Part Of The First Construction Phase. The Expansion Measure Will Be Planned And Put Into Operation Parallel To The First Construction Phase In Order To Ensure A Consistent, Technically Coordinated Commissioning Of The Entire Route. Objective The Aim Of The Project Is To Completely Migrate The Outdated Interlocking Technology To Dstw Technology. This Includes: Digital Signal Box Components Centralized Control Securing Operational Processes Through Modern Interfaces To Neighboring Projects And Adjacent Sections The Control Of The Cochem And Treis-Karden Operating Points As Well As The Open Route Between Bullay And Cochem Is Carried Out Via The Bso In Wittlich (Is In The Area Of ​​The First Construction Stage).

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 180ce45e-7d2f-48a8-8102-223c012e4fa2.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail