Engineering Services – Deutsche Bundesbank, Moveit In The Dg Fil. Erfurt, Property Planning Building. The Office Building Of The Bundesbank Branch In Erfurt Was Handed Over In 1997. It Is Located Next To The Ministry Of Economics Of The Free State Of Thuringia In Erfurt. The Building Has A Usable Area Of 5,480 M², Distributed Over An Attic, An Upper Floor, The Ground Floor And A Basement. The Client Plans To Modernize The Network Cabling In The Entire Service Building. In Addition To The Necessary Measures In The Technical Area, The 34.0615 Moveit Project Also Includes The Measures Required To Modernize The Network Cabling In The Structural Area, Which Are To Be Planned And Their Implementation Monitored As Part Of The Property Planning Building Contract (Service Phases 2 And 3 As Well As 5 To 8 Hoai). In Accordance With The Specifications And Requirements Of The Technical Planning For Network Cabling, The Dismantling And Assembly Or Dismantling And Processing Of System Floors (Raised Floor, Cavity Floor) And Intermediate Ceilings (Plasterboard Suspended Ceiling, Acoustic Metal Cassette Suspended Ceiling) Must Be Planned On All Floors Of The Branch, Both In Partial Areas And In Very Small Areas, Taking Into Account The Specifications For Data Cabling In The Deutsche Bundesbank (Appendix 9 To The Contract). Necessary Protective Measures For Adjacent Components And Technical Systems Must Be Provided. Necessary Inspection Openings As Well As Bushings And Breakthroughs Of Any Kind In Walls And Ceilings Must Be Created Or Upgraded In Accordance With Fire Protection Requirements. An Existing Data Room On The 1St Floor (Converted On Four Sides, But Without Room Closure To The Ceiling) Must Be Upgraded In Accordance With Fire Protection Requirements, Taking Into Account The Specifications For Data Cabling In The Deutsche Bundesbank, And Integrated Into The Existing Fire Alarm System And Building Automation. Further Expansion Work (Such As Painting, Flooring, Building Cleaning, Etc.) Must Be Taken Into Account. The Services For The Coordination Of Other Freelancers Working On The Project Are Not To Be Provided Within The Building Project Planning Contract. Due To The Vast Majority Of The Electrical Engineering Measures, The Contractor Coordinates The Technical Equipment, Electrical Engineering And Building Automation Within The Scope Of Special Services, The Freelance Contractors For Object Planning Buildings As Well As The Other Specialist Planners And Necessary Experts Involved. Construction Must Be Carried Out In Sections While Operations Continue. Necessary Interim Solutions Must Be Planned. The Aspects Of Economical And Sustainable Construction Must Be Considered Separately. Increased Security Requirements Apply To The Office Building Of The Bundesbank Branch In Erfurt. Employees Of External Engineering Offices Must Undergo A Background Check Before Regular Access To The Erfurt Branch Office Building. The Estimated Construction Costs For The Moveit Project In The Erfurt Branch Office Building Are Around Eur 1.5 Million Gross. The Object Plan For The Contract
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.