Tenders Are Invited For Construction Work For A Project To Develop Logistics Efficiency To Be Able To Connect With The Asean Region. Highway No. 21, Control Section 0503, Hua Na-Saklong Section, Activities To Improve The Potential Of Road Surfaces To Develop Transportation Infrastructure To Connect Travel To Tourist Attractions. Highway 21, Controlled Section 0503, Hua Na-Sak Long Section, Between Km. 259+175-Km. 262+585, Nam Chun Subdistrict, Lom Sak District, Phetchabun Province
Tenders Are Invited For Construction Work For A Project To Develop Logistics Efficiency To Be Able To Connect With The Asean Region. Highway No. 21, Control Section 0503, Hua Na-Saklong Section, Activities To Improve The Potential Of Road Surfaces To Develop Transportation Infrastructure To Connect Travel To Tourist Attractions. Highway 21, Controlled Section 0503, Hua Na-Sak Long Section, Between Km. 259+175-Km. 262+585, Nam Chun Subdistrict, Lom Sak District, Phetchabun Province
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
19-12-2025
Work Detail
Bidding For Construction Work For A Project To Develop Logistics Efficiency To Be Able To Connect With The Asean Region. Highway No. 21, Control Section 0503, Hua Na-Saklong Section, Activities To Improve The Potential Of Road Surfaces To Develop Transportation Infrastructure To Connect Travel To Tourist Attractions. Highway 21, Controlled Section 0503, Hua Na-Sak Long Section, Between Km. 259+175-Km. 262+585, Nam Chun Subdistrict, Lom Sak District, Phetchabun Province By Means Of Electronic Bidding (E-Bidding)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.