1. The Subject Of The Order Is The Construction Of A Nursery - A Low-Energy Building In Orneta. 3. The Scope Of The Subject Of The Order Includes In Particular: 1) Preparatory Works: A) Preparation And Protection Of The Construction Site, B) Geodetic Marking Out Of The Facility, C) Construction Of Temporary Connections, 2) Construction Works: A) Earthworks, Foundations, Moisture-Proof Insulation, B) Construction Of A Single-Story Building, Walls, Flat Roofs With Thermal Insulation Made Of Mineral Wool, C) Flat Roof Covered With Felt, Installation Of A Photovoltaic Installation, D) Window And Door Joinery, E) Facade In The Etics System (Styrofoam/Wool), Thin-Layer Plaster, Fine-Grained Plaster Plinths, F) Internal Finishing: Plasters, Painting, Stoneware And Pvc Floor Coverings, G) Construction Of Two Patios From Rubber Boards And Drainage To A Well, 3) Installations: A) Electrical Installation, Lighting, Evacuation Lighting, Lightning Protection Installation, B) Water And Sewage Installation, Hot Water, Sewage And Rainwater Collection, C) Mechanical Exhaust Ventilation, Heat Recovery And Air Conditioning, D) Underfloor Heating With Connection To The Existing Heating Network In The Kindergarten, E) Two Internal Fire Hydrants Power Switch, 4 Fire Extinguishers, 4) Infrastructure And Area Development: A) Connection To The Existing Electricity And Heating Installation In The Kindergarten Building, B) Removal Of 4 Lighting Poles, C) Construction Of Parking Spaces, Sidewalks, Driveways And Hardening Of The Area, D) Strips Around The Building, 5) Equipment: The Order Includes The Delivery And Assembly Of Complete Room Equipment, Including: A) Furniture And Equipment Administrative: Desks, Armchairs, Containers, Wardrobes (4- And 6-Module, Utility, For Documents), Medical Couch; B) Furniture And Equipment For Children: Tables, Chairs, Round Tables, Couches, Feeding Seats, Shelves For Toys, Carpets, Mats; C) Sanitary And Utility Equipment: Bedding Wardrobe, Cleaning Products Wardrobe, Chamber Pot Shelf, Dispensers Soaps, Towel Dispensers, Mirrors; D) Technical And Safety Equipment: 65 Interactive Monitor, Video Intercom Monitor, First Aid Kit, Fire Protection Switch; 3. A Detailed Description Of The Subject Of The Order And Its Scope Was Specified In The Design Documentation, In The Technical Specification For The Execution And Acceptance Of Construction Works, Constituting Annex No. 9 To The Swz.