Independent Commissioning Authority Consultant Services For Donnelly – Georges P. Vanier School Addition And Modernization . The Scope Of The Project Is The Rightsizing And Modernization Of The Existing School, Which Has An Existing Capacity Of 788 Students In Grades 7 To 12. The Rightsizing Of The School Will Reduce The Capacity By Demolishing A Portion Of The School And Adding To The Size Of The Gym Space. Existing Gross Floor Area: Is7,068 M² While The Planned Gross Floor Area At Opening Is 5,178 M², Final Reduced Capacity Resulting From The Rightsizing Exercise To Be Determined As Part Of The Design Phase.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.