Stage 7 Bottom And Side Closure And 01 Service Area Measuring 5X5 (According To Abnt Standards)., Stage 07X05 – From 02 To 04 Days: With Assembly And Disassembly – Floor And Stage 07X05 With 2-Way Flame-Resistant Tarpaulin Cover, Stage 07X05 – From 05 To 10 Days: With Assembly And Disassembly – Floor And Stage 7 Assembly And Disassembly – 10X08 Floor And Stage With 2-Wave Flame-Resistant Canvas Cover, 12/15/2025 - 08:08:00, 10X08 Stage – From 05 To 10 Days: With Assembly And Disassembly – 10X08 Floor And Stage With 2-Wave Flame-Resistant Canvas Cover, Stage 10X12 – 01 Day: With Assembly And Disassembly – 10X12 Floor And Stage With 2-Way Flame-Resistant Tarpaulin Cover, Measuring: 12 Mt In Front And 10 Mt In Depth, Handrail And Bottom And Side Closure. And 02 Service Area Measuring 5X5 (According To Abnt Standards)., Stage 10X12 – From 02 To 04 Days: With Assembly And Disassembly – Floor And Stage 10X12 With 2-Way Fireproof Tarpaulin Cover, Stage 10X12 – From 05 To 10 Days: With Assembly And Disassembly – Floor And Stage 10X12 With 2-Way Flame-Resistant Canvas Cover, 14X12 Stage – 01 Day: With Assembly And Disassembly – 14X12 Floor And Stage With 2-Way Flame-Resistant Canvas Cover, With Tubular Structure, Measuring: 14 Mt In Front And 12 Mt In Depth, 50 Mt From The Floor, Handrail And Bottom Closure And Side And 02 Service Area Measuring 5X5 (According To Abnt Standards)., Stage 14X12 – From 02 To 04 Days: With Assembly And Disassembly – Floor And Stage 14X12 With 2-Water Flame-Resistant Tarpaulin Cover, Stage 14X12 – From 05 To 10 Days: With Assembly And Disassembly – Floor And Stage 14X12 With 2-Way Fireproof Canvas Cover, Practicable Stage – From 01 Day: Practicable, With Locks, Each Module Measuring 2.00 10 Days: Practicable, 14X7 Stage – 01 Day: With Assembly And Disassembly – Floor And Stage Containing 14 M In Depth, 7 M In Ceiling Foot And 2.20 From The Floor To The Stage Floor, With 01 Service Areas (Sound And Light) Of 5X5 On The Same Level And Supporting The Weight Of 70 (Seventy) People Or 5,000 Kg. Stage Without Cover And 02 Service Area Measuring 5X5. 07 (Seven) Practicable Pantographs Or Telescopes With Locks, In Excellent Condition, With 02 (Two) Minimum Height Levels (In Case Of A Festival, They Must Have Wheels) And 02 (Two) Access Ladders. The Sides Of The Stage Must Be Closed With 2, 20 Meters Of Wood, And 3, 30 Meters At The Bottom. It Must Be In Compliance With The Cbpm Regulations., Stage 14X7 – From 02 To 04 Days: With Assembly And Disassembly – Floor And Stage Containing 14 M In Depth, Stage 14X7 – From 05 To 10 Days: With Assembly And Disassembly – Floor And Stage Containing 14 M In Depth, Stage 14X7 – From 01 Day: Stage With Flame Retardant Tarpaulin Cover And 02 Service Area Measuring 5X5. With Assembly And Disassembly – Floor And Stage Measuring 14 M Deep, With 01 Service Areas (Sound And Light)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.