Tenders Are Invited For Construction Work To Reinforce The Asphalt Surface (Modified Asphalt Concrete) According To The Model Of The Intercity Highway District. Special Highway No. 7, Nong Khang Khok - Takhian Tia Section, Between Km. 88+000 - Km. 88+900 Lt. (Intermittently), Work Volume 13,200.00 Sq M.
Tenders Are Invited For Construction Work To Reinforce The Asphalt Surface (Modified Asphalt Concrete) According To The Model Of The Intercity Highway District. Special Highway No. 7, Nong Khang Khok - Takhian Tia Section, Between Km. 88+000 - Km. 88+900 Lt. (Intermittently), Work Volume 13,200.00 Sq M.
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
18-12-2025
Work Detail
Bidding For Construction Work To Reinforce The Asphalt Surface (Modified Asphalt Concrete) According To The Model Of The Intercity Highway District. Special Highway No. 7, Nong Khang Khok - Takhian Tia Section, Between Km. 88+000 - Km. 88+900 Lt. (Intermittently), Work Volume 13,200.00 Sq M. By Electronic Bidding (E-Bidding)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.