The Subject Of The Order Is The Thermal Modernization Of The Building Of Kindergarten No. 72 As Part Of The Task: Wpf (Ue) Katowice Clean Air. Thermal Modernization Of The Building Of Municipal Kindergarten No. 72 In Katowice. The Subject Of The Order Includes Construction Works In The Field Of Insulation Of Foundation And Basement Walls Below Ground Level To A Depth Of Approx. 2.30 M, Insulation Of The Ceiling Above The Top Floor, Partial Replacement Of Internal Door Joinery And Fragmentary Replacement Of External Door Joinery (Main And Side Entrance Doors). The Sanitary Installation Works Will Include Replacing The Heating System With A Biomass Boiler, Modernizing The Central Heating Installation With Radiators, Thermostatic Valves And Division Into Heating Circuits, Replacing The Domestic Hot Water Installation. Excluding The Kitchen (Connection To A Biomass Boiler Room With Central Hot Water Preparation And Circulation), Replacement Of Heat Exchangers, Replacement Of The Internal Central Heating Installation. The Electrical Installation Includes Replacement Of Fixtures In Some Childrens Playrooms And Toilets, Installation Of Emergency Lighting, Replacement Of The Lightning Protection System And Switchboards, Cctv Installation Of The External Area And Internal Monitoring, And Installation Of Photovoltaic Panels In The Flat Part Of The Roof. Due To The Excavations Carried Out Near The External Walls, It Is Assumed That Damaged Stairs, Pedestrian Paths, Platforms And Accesses To The Building Will Be Restored. The Roof Covering Will Not Be Replaced Due To Its Good Technical Condition And The Historic Nature Of The Building. It Is Not Planned To Insulate The External Walls Of The Building Above The Ground, Therefore, The Outline Of The Building And The Roof Will Not Change. A Lift For Disabled People And The Installation Of Two Internal Stair Platforms Are Planned At The Rear Stairs. General Numerical Data: - Building Area: 381.05 M2 - Usable Area: 1,110.25 M2 - Volume: 5,260.65 M3 - Number Of Above-Ground Floors: 3 (Ground Floor, First Floor Floor, 2Nd Floor) Number Of Underground Floors: 1 (Entire Basement) Building Height (Medium-High Building, Sw): O To The Ceiling Above The Top Floor: 12.60 M O To The Top Of The Roof: 17.20 M Year Of Construction: 1905. The Building Is Entered In The Municipal Register Of Monuments Of The City Of Katowice. Construction Works Will Be Carried Out Based On Design Documentation Prepared By: Dsw Dorota Setlak-Wróblewicz, Constituting An Integral Part Of The Swz, In Accordance With The Principles Of Construction Art And Modern Technical Knowledge, Using Applicable Regulations, Standards And Technical Specifications For The Execution And Acceptance Of Works. The Description Of The Subject Of The Order Is Included In The Design Documentation Constituting Annex No. 9 To The Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.