Tenders Are Invited For Road Bridge Construction Work - Design And Execution Of Works On The Objective Podet Dn 13A Km 105+992, Vlahita Locality, Harghita County - Drdp Brasov
Tenders Are Invited For Road Bridge Construction Work - Design And Execution Of Works On The Objective Podet Dn 13A Km 105+992, Vlahita Locality, Harghita County - Drdp Brasov
Road Bridge Construction Work - Design And Execution Of Works On The Objective Podet Dn 13A Km 105+992, Vlahita Locality, Harghita County - Drdp Brasov. Design And Execution Of Works At The Objective Podet Dn 13A Km 105+992, Vlahita Locality, Harghita County. The Contracting Authority Reserves The Right To Modify The Contract According To The Provisions Of Art. 221 Paragraph (1) Letters A), E) And F) Of Law 98/2016 With Subsequent Amendments And Additions, Provided That This Does Not Fall Within The Provisions Of Art. 221 Para. (7), That Is, Not To Represent A Substantial Change. Any Changes That May Occur During The Period Of The Contract Refer To The Following: 1. Changes Of The Contracting Parties; 2. Changing The Name And/Or Form Of The Company, Changes That Do Not Involve The Creation Of A New Legal Entity; 3. Changes Resulting From The Adaptation Of The Technical Project To The Reality In The Field, Including Changes In Specific Technical Solutions; 4. Changes Generated By Changes To The Land, The Above-Ground And Underground Hydrographic Network Unknown At The Time Of The Project Development; 5. Modifications Resulting From Changes In Elevations, Positions And/Or Dimensions Of Some Works As A Result Of The Situation In The Field; 6. Changes Generated By The Requirements Of The Environmental Authorities; 7. Changes Generated By The Change Of Key Personnel/Other Personnel, Which Will Be Carried Out According To The Corresponding Clause In The General Conditions Of The Contract; 8. Changes Generated By The Inclusion Of New Subcontractors And/Or The Replacement Of The Initial Subcontractors, Which Will Be Carried Out According To The Corresponding Clause In The General Conditions Of The Contract; 9. Changes To The Expropriation Corridor/Corridor That Lead To The Need To Carry Out Additional Works And/Or To Abandoning The Carrying Out Of Some Existing Works In The Contract; 10. Changes Generated By Agreements, Conventions, Understandings Of The State/Local Authorities With Other States; 11. Legislative Changes Or Technical Rules/Status/Normatives/Standards, During The Performance Of The Contract; 12. Extension Of The Execution Period;. 13. Changes Resulting From The Implementation Of Requests From Various Institutions/Authorities/Entities That Have Powers Related To The Investment Objective (For Example: Ministries, Central And/Or Local Authorities/Institutions, Certified Verifiers, Control Bodies, Etc.). Anticipated Extension Interval: According To Clause 35 [Extension Of The Execution Period] Of The General Conditions Of Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.