Quotation are invited for Repairing of Wrapping & Coating on Failure Pipeline 1032505920 1 ITEM-00001 CONTRACTOR#S SCOPE OF WORK:·#EXPOSING THE EXISTING PIPE TO PROVIDE ACCESS BY MANUAL EXCAVATION (SIZE: 3M X 2.5M X 10M IF REQUIRE D) FOR INSPECTION.RESTORE THE BERM WITH ORIGINAL GATCH MATERIAL.·#UNWRAPPING OF EXISTING BELOW GROUND PIPELINE.·#SURFACE PREPARATION AS PER STANDARD SA2.5 TO BE DONE WITH A TEMPORARY ENCLOSURE ERECTED BY THE CONTRACTOR AFTER BARRICADING THE AREA. ABRASIVE TYPE SHALL BE GARNET AND SIZE SHALL BE 30/60.·#MATERIAL SAFETY & DATA SHEET (MSDS) AND MATERIAL APPLICATION DETAILSTO BE PROVIDE D BEFORE MOBILIZATION THE JOB. ONLY APPROVED AND TESTEDMATERIALS SHALL BE USED.·#SPECIFIC CORROSION RESISTANT COATING ON THE SAME AR EA.·#REWRAPPING ON SAME PIPE.·#BACKFILLING, LEVELLING THE GROUND SURFACE AND COMPACTION MANUALLY ASPER STANDARDS & 1 JOB REQUIREMENT AT JA FZA.·#THE WASTE/RESIDUES AFTER SUCH WORK SHOULD BE CLEARED ON DAILY BASIS.·#ANY HOT WORK SHOULD HAVE PRIOR WRITTEN PERMIT FROM DEWA. THECONTRACTOR#S SUPERVISOR SHOULD HAVE RISK ASSESSMENT & METHOD STATEMENTAT SITE AND SHOULD PROVIDE TOOL BOX TALKS ON DAILY BASIS .·#THE CONTRACTOR SHALL VISIT THE SITE TO UNDERSTAND & FULLFAMILIARIZATION WITH THE SCOPE OF WORK, PREMISE ACCESS, FACILITIES,COMPL EXITIES, SAFETY MEASURES ETC., BEFORE SUBMITTING THEIR BID. THEMENTIONED SCOPE HERE IS INDICATIVE ONLY.·#ALL DEWA SAFETY & ENVIRONME NT POLICY, RULES AND REGULATION SHALL BEFOLLOWED AT WORK SITE DURING THE EXECUTION OF THE WORK. THE CONTRACTORSHOULD BE FAMILIAR WIT H SAFETY REGULATIONS WHILE WORKING IN A HAZARDOUSAREA.·#ENTRY PERMITS FOR THE WORKERS SHOULD BE APPLIED 05DAYS PRIOR(CONTRACTOR) TO START THE JOB WITH PASSPORT COPIES HAVING VALID VISAAND SHALL BE ON CONTRACTOR#S PAYROLL.·#13.#ENTRY PERMITS FOR THE VEHICLE SHOULD BE APPLIED WITH COPIES OFREGISTRATION, DRIVING LICENSE AND HIS PASSPORT COPY WITH VALID VISA.·#ALL THE PERSONS SHOULD WEAR THE UN IFORM, PPE WHILE AT WORK,INDICATING THE ORGANIZATIONS LOGO AND COMPANY NAME.·#ALL MATERIAL AND TOOLS BROUGHT IN SHALL BE DECLARED AT SECURITY GATEAND THE LIST OF THESE ITEMS SHALL BE SIGNED BY DEWA SECURITY. THECOPIES OF THESE DOCUMENTS SHALL BE LODGED WITH DEWA ENGINEER IN-CHARGEON DAILY BASIS. THIS DOCUMENT WILL BE THE BASIS FOR THE CLEARANCE (GATEPASS) TO TAKE THEM OUT ON COMPLETION OF T HE JOB.·#DEWA ENGINEER-IN-CHARGE SHALL BE UPDATED THE WORK PROGRESS ON AREGULAR BASIS.·#ALL APPLICABLE EQUIPMENT AND TOOLS SHOULD HA VE VALID TEST CERTIFICATEFROM 3RD PARTY LICENSED CERTIFYING AGENCIES.·#INCLUDING ALL, THE FOLLOWING SHALL BE ARRANGED BY THE CONTRAC TOR ASPART OF THE CONTRACT WORK. A. TRANSPORTATION EITHER STAFF OR MATERIAL ON BOTH SIDES. B.#ALL CONSUMABLE LIKE BLASTIN G GRIT, REPAIRING KIT, WRAPPING TAPE & FINAL COATING ETC REQUIRED FOR THE WORK. C.#HAND AND POWERED TOOLS (WA TER & FIRE PROOF CERTIFIED), RIGGING TOOLS, MATERIAL HANDLING FACILITIES. D.#CONTRACTOR NEED TO PROVIDE TOTAL ELECTRIC AL LOAD FOR COMPLETE JOB PRIOR TO START THE JOB. E.#POWER TOOLS TEST CERTIFICATE TO BE SUBMITTED PRIOR TO STA RT THE JOB BY AN APPROVED & CERTIFIED AUTHORITY. F.#TARPAULINS, HAND AND WORKING LAMPS, TEMPORARY SUPPORTS ETC. G .#PERSONAL SAFETY /PROTECTION EQUIPMENT, FIRST AID KIT, FOR THEIR STAFF AT SITE. H.#IN GENERAL ALL ITEMS OF TOOLS, ACC ESSORIES, CONSUMABLE, HOSES, CABLES, DISTRIBUTION BOARD ETC. OTHER THAN FACILITIES PROVIDED BY DEWA SHALL BE ARRANGED BY THE CONTRACTOR.DEWA SCOPE:A.#LINE CLEARANCE AND ISOLATION SPECIAL NOTES / INSTRUCTIONS: Repairing of wrapping & coating on failure pipeline For queries contact Mr Gopal. Phone: 04-80-44558 #
[email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332503220)/$value