Tenders Are Invited For Roadworks - Acquisition And Execution Of Works Required For The Investment Objective Connection Road To The Already-Paved High-Speed Road
Tenders Are Invited For Roadworks - Acquisition And Execution Of Works Required For The Investment Objective Connection Road To The Already-Paved High-Speed Road
Roadworks - Acquisition And Execution Of Works Required For The Investment Objective Connection Road To The Already-Paved High-Speed Road. The Main Technical Characteristics Of The Investment: Road Length: 1660 M • Road Side 2 Lanes Of 3.5M Each Framed With Prefabricated Curbs 20X25 Cm – 2X3.50 = 7.00 M • Green Space (Safety Zone) On The Right Side 1 X 1.20M Including The Curbs That Delimit The Roadway From It • Green Space (Safety Space On The Left 1X1.80M Including The Curbs Delimiting The Carriageway From It • Two-Way Bicycle Tracks On The Left Side 1 X2.00M • Sidewalk On The Left Side 1 X1.50M Bridge Over The Someș River • On Metal Arches, With A Single Span Of 99.00M, Having A Span Of 97.00M And A Total Length Of 115.50M • Bridge With One Span • Roadway 8.00M • Sidewalks 1.50M Left And 2.0M Right (The Sidewalk On The Right Side Has The Role Of Ensuring Inspection And Maintenance In Operation) • Two-Way Bicycle Tracks On The Left Side Of 1X2.00M Bridge Over The Collector Canal • With A Single Opening, Being Made With Prefabricated Prestressed Concrete Beams With A Height Of 1.05M And A Length Of 24.00M, The Total Length Of The Parapet, Including The Turned Walls, Will Be 34.00M. It Will Cross A Collector Channel, With 70 Degrees To The Left. • Road Side 8.00M • Sidewalks 1.50M Left And 2.0M Right (The Sidewalk On The Right Side Has The Role Of Inspection And Maintenance In Operation) Two-Way On The Left Side 1X2.00M Overpass Over Highway Cf 412 • It Will Have 9 Openings (4X30.00M+1X76.90M+4X30.00M), The Total Length Of 338.00M And It Will Be Located In A Right-To-Right Curve With A Radius Of 360.00M • Roadside 8.00M • Sidewalks 1.50M Left And 2.0M Right (The Sidewalk On The Right Side Has The Role Of Ensuring Inspection And Maintenance In Operation) • Two-Way Bicycle Tracks On The Left Side 1X2.00M Dalat Bridge D5l-5.00M • Roadway 8.00 M • Sidewalks 1.50M Left And 2.0M Right (The Sidewalk On The Right Side Has The Role Of Ensuring Inspection And Maintenance In Operation) • Two-Way Bicycle Tracks On The Left Side 1X2.00M Water Drainage Along The Route, Water Drainage Will Be Ensured By The Drains Located At The Edge Of The Roadway And Connected To The Designed Storm Sewer, Pehd Storm Sewer Pipe D=400 Mm Laid On A 20 Cm Bed Of Compacted Sand, With Discharge Into The Outfalls In The Area In The Embankments, Hydrocarbon Separators Will Be Placed. Given The High Height Of The Embankment, 10 Cm Thick V30/37 Concrete Trenches Will Be Installed On A 10 Cm Thick Layer. Guardrails Will Be Installed In The Area To Protect Pedestrians And Cyclists. The Green Space Between The Carriageway And The Cycle Track Road Markings And Signs To Ensure Road, Bicycle And Pedestrian Traffic In The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.