Tenders Are Invited For Harbor Construction Works – Procurement Of Construction And Other Works For The Project Ika Port Extension - Secondary Breakwater And West Coast
Tenders Are Invited For Harbor Construction Works – Procurement Of Construction And Other Works For The Project Ika Port Extension - Secondary Breakwater And West Coast
Harbor Construction Works – Procurement Of Construction And Other Works For The Project Ika Port Extension - Secondary Breakwater And West Coast. The Construction Of The Secondary Breakwater Will Be Partly Carried Out In The Same Position As The Existing Jetty And Extended At An Angle By 60 M. The Width Of The Breakwater Is 6 M, And The Total Length Is 106 M On The Outside And 109 M On The Inside. The Top Of The Breakwater Was Constructed With An Extension Of 11 M For The Protection Of The Water Area And For The Possibility Of Docking Vessels For Loading Or Unloading. The Construction Of The Secondary Breakwater Will Provide 33 Communal Connections For Ships 5-6.5 M In Length, And A Footbridge Will Be Constructed Along The Same Length From The Inside Of The Breakwater At An Elevation Of +0.80 M. The West Coast Is Located Within The Protected Part Of The Water Area Of The Port Of Ika, Right Next To The Coastal Promenade, But At A Lower Elevation Of +1.10 M.A.S.L. The Planned Jetty Is 67.50 M Long And 3.0 M Wide. The Construction Of The Jetty Consists Of Coastal Fortifications And Reinforced Concrete Supports Of The Span Structure, Which Are Connected By A Walking Pavement Into A Single Unit. The Construction Of The Jetty On The West Coast Will Provide 22 New Utility Connections. Technical And Project Documentation With Blueprints Will Be Available To Interested Business Entities Through The Eojn Of The Republic Of Croatia.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.