Water-Main Refurbishment Construction Work – Dúbravica, Restoration Of The Public Water Supply. The Subject Of The Order Is The Development Of Project Documentation For The Implementation Of The Construction And The Construction Of The Work: Dúbravica, Renewal Of The Public Water Supply; Including The Operating And Handling Order, Archaeological Survey, Geodetic Focus, Construction Organization Project, Temporary Traffic Marking Project, Documentation Of The Actual Execution And Plan For The Use Of Public Works. The Reconstruction Of The Water Pipeline With The Construction Of 57 Water Connections Will Be Implemented In The Village Of Dúbravica. The Newly Designed Pipeline Will Replace The Existing Pipeline After Its Useful Life. The Route Of The New Pipe Will Be Outside The Parcels Of Private Owners, In The Axis Of The Driving Lane, And The Hatches From The Caps Of The House Connections Must Be Brought Out To The Green. The New Pipe Is Laid Next To The Existing Pipe And The House Connections Are Connected To The Existing House Connections. The Existing Pipeline Will Remain In The Ground. The New Pipeline Will Be Built Without A Trench As A Priority, As Long As The Geological Conditions Allow It.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.