Tenders Are Invited For Sewer Construction Work – Design And Execution Of Works For The Establishment Of A Water Supply System And A Wastewater Sewage System In The Nicseni Botosani Commune
Tenders Are Invited For Sewer Construction Work – Design And Execution Of Works For The Establishment Of A Water Supply System And A Wastewater Sewage System In The Nicseni Botosani Commune
Sewer Construction Work – Design And Execution Of Works For The Establishment Of A Water Supply System And A Wastewater Sewage System In The Nicseni Botosani Commune. The Object Of The Investment Is Presented In Detail In The Technical Documentation From This Award Documentation, And Consists Of The Following: Stage I Includes The Design And Execution Of Works For: - The Water Supply System Consisting Of: The Water Supply Network Of 12525 Ml Peid Pipeline, 18 Valves, 1 Pumping Station, Undercrossings Of 354 Ml And Overcrossings Of 20 Ml, And A Distribution Network Of 5946 Ml Peid Pipeline, 10 Valve Manholes, 16 Above-Ground Hydrants And 158 Branch Manholes - The Sewage System Consists Of: Gravity Sewer Network Of 4427 Ml Pvc Pipe, Including 158 Connection Manholes And 114 Inspection Manholes, Undercrossings Of 169 Ml, Pressure Sewerage Network Of 421 Ml Peid Pipe, 2 Pumping Stations And A Treatment Station. Stage Ii Design And Execution Of Works For: - The Water Supply System Consisting Of: The Water Distribution Network Of 8181 Ml, 34 Valve Shafts, 18 Above-Ground Hydrants, 388 Branch Shafts And Underpasses Of 71 Ml. - The Sewerage System Consists Of: Gravity Sewer Network Of 8303 Ml Pvc Pipe, 195 Inspection Pipes, 388 Connection Pipes, 98 Ml Underpasses, Pressure Sewer Network Of 2844 Ml Peid Pipe, 5 Pumping Stations And 1 Treatment Station. The Estimated Value Of The Contract, Accumulated For Both Stages, Does Not Include The Share Of Miscellaneous And Unforeseen In The Maximum Amount Of 40785.93 Lei Without Vat. This Amount Can Be Accessed During The Execution Of The Works In Accordance With The Provisions Of Art. 221 Of Law No. 98/2016, For Quantitative Differences Determined By Additional Requirements Of The Authority, Changes To The Execution Details To Adapt To The Conditions In The Field Or As A Result Of Revisions Imposed By Various Opinions Or Decisions Of Third Parties Or Any Other Situations That Do Not Constitute A Substantial Change In The Meaning Of The Procurement Legislation, In Compliance With The Legal Provisions In Construction. (Ml = Linear Meters, Pc = Pieces)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.