Engineering Services – Fürstenfeldbruck Secondary School Extension. Specialist Planning For Technical Building Equipment Hls The Following System Groups Are Commissioned: • Sewage, Water And Gas Systems, • Heat Supply Systems, • Air Conditioning Systems Services For The Following Objects: North Extension, South Extension, Conversion Of Existing Buildings, Container System The Service Is Awarded In Stages: • Level 1: Lph 1-2 • Level 2 A: Lph 3 • Level 2 B: Lph 4 • Level 3: Lph 5-7 • Level 4: Lph 8-9, Container System Without Lhp 9 For North Extension, South Extension, Existing Conversion: The Technical Equipment (Hls) Specialist Planning Requires The Following Services To Be Provided: • Technical Equipment (Hls) For The North Extension, Including Connection To The Existing Building And Associated Demolition Measures (North Auditorium, Elevator), Lph 01-09 • Technical Equipment (Hls) For The South Extension Including Underground Car Park And Connection To The Existing Building With Associated Demolition Measures (Teachers Room, South Auditorium, Pavilion), Lph 01-09 • Technical Equipment (Hls) For The Conversion And Repair Of The Existing Building, Lph 01-09 • As Well As Special Services According To The Service Profile It Should Be Noted That Two Variants For The South Extension Are Developed Through The Property Planning For Lph 1 And 2: A Variant In Solid Construction And A Variant In Timber Or Timber Hybrid Construction. At The End Of Lph 2, The Client Selects One Of The Two Variants For Further Processing. Both Variants Must Be Processed By The Technical Equipment Planning Department (Hls) As Part Of Lph 1 And 2 So That The Selected Variant Can Be Continued In Lph 3. The Resulting Costs For Variant 2 Must Be Offered In The Corresponding Special Service (3.2.1). The Specifications Of The Feasibility Study Must Be Adhered To. All Deviations Must Be Agreed With The Client. When Calculating The Offer, It Must Be Taken Into Account That Contaminated Sites May Be Present In The Existing Building And In The Subsoil. An Appraisal Is Commissioned By The Client During The Planning Phase. The Requirements Of The Project Description Must Be Followed. The North Extension, The South Extension And The Conversion Of The Existing Building Are Viewed As One Common Object In Terms Of Fees. Container System If It Turns Out In The Course Of Lph 1 And 2 That Additional, Temporary Classrooms Are Required, The Expansion Of The Container System Must Be Accompanied By The Technical Equipment Planning Department (Hls). Only Alg 1, 2 And 3 Are Affected By This. The Container Facility Is A System Structure From The Company Fagsi, Which Will Dismantle The Facility. The Increase Is To Be Offered As An Optional Basic Service. The Container System Will Be Dismantled At The End Of The Project; This Must Be Taken Into Account In The Planning. The Client Intends To Apply For Funding As Far As Possible For: • North Extension • South Extension • Existing Renovation. The Client Also Intends To Carry Out Certifications Wherever Possible. The Technical Equipment Planning Department (Hls) Is Responsible For Assisting With These Processes By Delivering Plans Etc
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.