The Project Includes The Enabling And Construction Of Four Deep Wells, Each With A 100 Meter Deep Borehole And A Drilling Diameter Of 12 Inches. Subsequently, The Piping Will Be Carried Out With Astm A53, Sch 40 Steel Pipes With A Thickness Of 7.80 Mm And A Nominal Diameter Of 8 Inches, With Welded Joints. In Addition, Each Well Will Have A Casing 1 Meter Above Ground Level. All Of The Above According To Plans And Technical Specifications Prepared For The Purpose.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.