Metalworking – Münster, Research Production Battery Cell 2.Ba Fab; Steel Construction. Main Masses Tender: 2.5 Tons Steel Structure, S235, Primed, Beam, Rectangular Profile 400/700 Mm 40 M Steel Structure, S235, Primed, Beam, Qr 80/80/4 Mm 40 M Steel Structure, S235, Primed, Beam, U-Profile 30/80/30 Mm 1 Piece Counter-Rotating U-Stairs With Platform, H= 4.50 M, Steps And Seats, Steel, Primed, Floor Covering 1 Piece Double-Flight Straight Staircase With Platform, H = 3.96 M, Steps And Seats, Steel, Primed, Floor Covering 1 Piece Opposite U-Stairs With Platform, H = 3.96 M, Steps And Seats, Steel, Primed, Floor Covering 100 M Crash Railing, Flat Steel, Primed, Glass Filling, H= 1,245 Mm 35 M Platform Railing, Stringer, Flat Steel, Primed, Glass Filling, H= 1,745 Mm 51 M Stair Railing, Stringer, Flat Steel, Primed, Glass Filling, H= 1,660 Mm