1. The Subject Of The Order Is Delivery And Assembly As Part Of The Investment Task: Construction Of Photovoltaic Installations On The Buildings Of The Volunteer Fire Brigades In The Babice Commune, Together With Energy Storage Facilities In Order To Improve The Quality Of The Natural Environment. The Facilities Are Located: - Ul. Saint Floriana 15, 32-551 Mętków, Plot Number 684/41, Kr1c/00035648/0, Pv Installation Power 15Kw, Capacity. 15 Kwh Warehouse - Ul. Chemików 2, 32-551 Rozkochów, Plot Numbers: 1151, 1152, 3475/2, Kr1c/00051981/4, Pv Installation Power 15 Kw, Capacity. Warehouse 15 Kwh-Ul. Kościelna 1, 32-555 Zagórze, Main Building, Plot No. 497/12, Kr1c/00030792/9, Pv Installation Power 12Kw, Capacity. Warehouse 12Kwh, Garages, Plot Number 497/5, Kr1c00060580/9, Pv Installation Power 3 Kw, Capacity 3Kwh2 Storage. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 2 To The Swz - Technical Description - Construction Of Photovoltaic Installations On Volunteer Fire Brigade Buildings In The Babice Commune, Together With Energy Storage Facilities In Order To Improve The Quality Of The Natural Environment. 3. The Contractor Will Provide The Delivery And Installation Service In Accordance With Applicable Law, Standards, Principles Of Sound Technical Knowledge, And On The Terms And Conditions Established In The Contract. 4. The Scope Of The Contract Includes The Design, Delivery, Assembly And Commissioning Of Three Installations. Photovoltaic Systems Along With Dedicated Energy Storage Facilities On The Buildings Of The Volunteer Fire Departments Located In The Babice Commune. The Project Includes Hybrid Installations, I.E. Operating In Both On-Grid And Off-Grid Modes, Enabling Emergency Power Supply To Selected Circuits Of Volunteer Fire Department Buildings. This Is Particularly Important Due To The Nature Of These Facilities - They Function As Rescue And Fire-Fighting Units, Maintaining Combat Readiness 24/7. The Scope Covers The Full Installation Implementation Cycle - From The Preparation Stage, Through Assembly, To Tests And Commissioning. It Includes: • Technical Selection Of Devices And Their Parameters, • Method Of Assembly And Configuration, • Quality And Acceptance Requirements, • Method Of Carrying Out Works And Organization Of The Assembly Site, • As-Built And Measurement Documentation, • Procedures For Reporting The Installation To The Osd. Annex No. 2 To The Swz Describes The Technical Components And Contains The Full Range Of Execution, Quality, Health And Safety, Fire Protection And Formal Requirements Required By The Investor, Contractor, Supervisory Inspector And Institutions. External, Such As Wfośigw, Dso And State Fire Service Bodies. The Designed Installations Are Aimed At: • Increasing The Energy Security Of Facilities, • Reducing Energy Operating Costs, • Ensuring Power Supply To Critical Loads During Network Failures, • Reducing Harmful Gas Emissions, • Improving Ep And Ec Indicators, • Meeting