1. Definition Of The Subject: 1.1. The Subject Of The Proceedings Is To Perform A Task Involving The Combination Of Several Investment Elements In Order To Finally Solve And Use The Entire Facility Within The Framework Of Convergence As To The Conditions And Functions Of Use. Each Of The Tasks Concerns Increasing The Functionality Of The Use Of The Selective Municipal Waste Collection Point In Kuryłówka (Pszok). The Task Is Divided Into Five Parts, Each Containing A Different Type Of Order, Provided That They Concern One Facility. 1.1.1. Task No. 1 - Construction Of A Hall, Pszok, Photovoltaics, Monitoring. Construction Of A Modern Warehouse That Will Enable Roofed, Safe Storage Of Waste - Will Provide Protection Against The Influence Of Weather Conditions Along With The Installation Of Pv Panels In A Closed System And Full Monitoring Of The Area To Increase Safety. 1.2. The Scope Includes Minimum Quantities And Conditions As Well As Minimum Requirements Indicated And Described In The Technical Documentation Attached To The Procedure, Technical Descriptions And Explanations And Responses Of The Ordering Party During The Procedures. An Integral Element Is Also The Swz, In Particular Section Ii, With A Description Of Elements Not Included In The Technical Documents Or Not Precisely Written Down If It Is Necessary To Specify Them In Detail. 1.3. The Ordering Party Will Accept Equivalent Means Of Evidence (Not Required Directly In The Proceedings But During Implementation) If They Confirm That The Offered Supplies, Services Or Construction Works Meet The Requirements, Features Or Criteria Specified By The Ordering Party, Which The Contractor Must Demonstrate Before The Actual Implementation Of The Task In A Given Scope. Maintaining The Basic Parameters And Requirements Of Materials And Devices And Their Conditions Of Use Are Also Described In The Swz. 1.4. Material Or Device Cards As Well As Certificates Must Be Presented Before Installation 1.5. All Materials And Devices Must Be Approved For Trading On The European Market, Otherwise, If This Fact Is Not Confirmed, The Ordering Party Will Assume That The Contractor Is Not Performing The Contract In Accordance With The Terms And Conditions. The Ordering Party May Request Confirmation At Any Time And For Each Element. 1.6. Detailed Requirements For Each Element Are Included In The Attached Technical Documentation And Swz Descriptions. 2. Technical Conditions For The Execution And Acceptance Of The Task. 2.1. The Technical And Functional Conditions For The Full Execution Of The Task And Its Acceptance Will Be Based On The Documentation Prepared For The Acceptance Of Construction Works And Deliveries 2.2. General And Additional Performance Conditions Not Included In Detail In The Construction Documentation But Necessary For Proper Performance, Which, Together With The Terms Of The Swz, Must Be Included In The Offer And Be Subject To Implementation, And Which Must Be Valued By The Contractor Itself Based
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.