Replacement Of The Temporary 12.2M Bailey Bridge With A New, Permanent 19M Long Single-Span Bridge That Includes Waterproofingmembrane And Asphalt Wearing Surface. Construction Of Approximately 450M Of Gravel Surfaced Roadway, Asphalt Pavement Aprons,Precast Concrete Approach Barriers, Signing, Drainage Culverts, And Landscaping. Riprap Protection And Habitat Restoration Features On Both Creek Banks And Within Creek Channelcreek Banks And Within Creek Channel. Removal Of Existing Bailey Bridge And Restoration Of The Detour Roadway.Please Direct All Project Specific Enquiries Related To This Rfx By Email To The Project Contact Identified Below And On The “Opportunity Details” Tab Under Additional Information Sct3.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.