Professional Services For The Gas Industry – Siloe / Maintenance For The Biogas Valorization Unit. The Siloe Water Pollution Control Plant With A Capacity Of 230,000 Pe Has Been Equipped Since 2017 With A Biogas Recovery Unit Allowing The Injection Of Biomethane Into The Grdf Network. The Recovery Unit Has A Nominal Purification Capacity Of 340 Nm3/H Of Biogas With Membrane Type Separation Technology. Biogas Comes From The Methanization Of Sanitation By-Products (Sludge, Grease, Waste Materials). The Purpose Of This Consultation Is The Preventive And Corrective Maintenance Of The Equipment Installed For The Valorization Of Biogas, Diagnostic Assistance, 24-Hour Assistance Via Telephone On-Call And The Restart Of The Installations Within 72 Hours.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.