1. The Subject Of The Order Is Reconstruction Of The Culvert On The Stream From Bronina In The City Of Radzanów, Busko-Zdrój Commune As Part Of The Budget Task Entitled: Organizing Rainwater Management In The Busko-Zdrój Commune, Taking Into Account Small Retention Which Involves The Demolition Of The Existing Culvert And The Construction Of A New Culvert. The Scope Of The Investment Includes: - Demolition Of The Existing Circular Culvert, - Execution Of Earthworks Along With Removal Of Excavated Material, - Construction Of A Concrete Foundation Under The Culvert, - Construction Of A Reinforced Concrete Footing Under The Culvert, - Construction Of A Temporary Pipeline Made Of Plastic Socket Pipes With An Internal Diameter Of 800 Mm In Order To Enable The Flow Of Water During Construction Works, - Performance Of Accompanying Works Related To The Construction Of A New Culvert, I.E. Pumping Water, Securing The Excavation, Using Wellpoints, - Construction Of A Concrete Tension Plate On Top Of The Culvert Class C25/30 With A Thickness Of 12 Cm Reinforced With Reinforcing Steel, - Insulation On The Walls, - Construction Of The Upper Layer Of Concrete Topping Made Of Class C16/20 Concrete With A Thickness Of 7 Cm, - Construction Of A Prefabricated Reinforced Concrete Box Culvert With External Dimensions Of 2.0 M X 1.5 M With Dock-Type Reinforced Concrete End Walls, - Strengthening The Slopes And The Bottom Of The Watercourse From Bronina In Front With Openwork Slabs Inlet And Behind The Inlet From The Culvert, - Construction Of Embankments - Backfilling Mechanically And/Or Manually With Soil From Spoil (Embedded, Forming The Embankment And Compacting In Layers), - Strengthening The Slopes Of The Stream At The Inlet And Outlet Using Openwork Concrete Slabs On A Gravel Base And Geotextile, - Restoring The Surface Of The Internal Access Road Over The Culvert Using Road Slabs On An Aggregate Base And Construction Of Aggregate Roadsides On Both Sides, - Installation Of Steel Protective Barriers On Both Sides Along The Internal Access Road, - Obtaining An Occupancy Permit. Note! Elements Intended For Demolition And Disassembly, Such As Rubble, Etc. - Will Be Dismantled And Disposed Of By The Contractor At His Own Expense. Any Scrapping Of Materials Resulting From Dismantling Is The Responsibility Of The Contractor And Is Not Subject To An Additional Fee. Documents From The Execution Of The Works In Question Should Be Presented Together With The Acceptance Documentation. The Contractor Will Place At The Entrance To The Construction Site: - A Construction Information Board, - A Permanent Board After The Completion Of Construction Informing That The Use Is Based On The Contract Concluded With Pgw Wody Polskie With Dimensions Of Min. 30 X 40 Cm, - During The Implementation Of The Works, The Contractor Is Obliged To Know And Comply With The Provisions Contained In All Legal Regulations In The Field Of Environmental Protection; In The Period From The Commencement T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.