1. The Subject Of The Order Is The Provision Of A Service Including Inspections, Maintenance And Supervision Of The Heating Management Of Gas Boiler Rooms, As Well As Preparation Of Inspection And Maintenance Reports Specifying The Scope Of Repair Activities To Be Performed. The Contractor Will Provide Services Consisting In The Performance Of: Inspections And Maintenance Of The Following Gas Boiler Rooms: - In The Stawy Military Complex In Buildings 1, 6, 12, 19, 22, 28, 52, 59, 78, 205, 274, 275, Building 1- Kitchen And Pre-Insulated Networks, - In The Stężyca Military Complex In Buildings No. 15, 26 And Pre-Insulated Networks, - In The Bezwola Military Complex In Buildings No. 68, 74, 75, 96, 99, 623, 624 And Pre-Insulated Networks Administered By The 41St Air Training Base In Dęblin, Owned By The State Treasury. Main Subject Of The Contract According To The Common Procurement Vocabulary (Cpv): Cpv Code Nomenclature According To The Common Public Procurement Vocabulary (Cpv) 50721000 - 5 Operation Of Heating Installations A Detailed Description Of The Subject Of The Contract Is Specified In This Swz And: - Annex No. 1 To The Swz, I.E. The Offer Form; - Annex No. 1A To The Swz, I.E. Description Of The Subject Of The Order; - Annex No. 9 To The Swz, I.E. Draft Provisions Of The Contract. - The Procedure Is Marked With Reference Number: 40/25/P. The Ordering Party Does Not Divide The Order Into Parts. The Ordering Party Did Not Use The Right To Divide The Contract Into Parts, Due To The Specificity Of The Contract Covered By The Public Procurement Procedure, It Would Pose A Risk Of Excessive Difficulties And The Need To Coordinate The Activities Of Various Contractors, Which Could Jeopardize The Proper Performance Of The Contract. It Is Advisable For The Service To Be Performed By One Contractor Due To The Warranty Provided For The Service. The Lack Of Division Of The Contract Into Parts And The Conditions For Participation In The Procedure Do Not Violate The Rules Of Competition And Thus Do Not Limit The Possibility Of Smaller Entities Applying For The Contract.2. Documents After Signing The Contract: Within 2 Days From The Date Of Signing The Contract, And Before Commencing The Provision Of Services In Accordance With The Subject Of The Order, The Contractor Undertakes To Provide The Person Responsible For The Implementation Of The Contract With The Following Documents: - Qualification Certificate Of The Energy Regulatory Office, Category D And E In Group No. 1 (Act Of April 10, 1997 - Energy Law), - Qualification Certificate Of The Energy Regulatory Office, Category D And E In Group No. 2 (Act Of April 10, 1997 - Energy Law), - Qualification Certificate Of The Energy Regulatory Office, Category D And E In Group No. 3 (Act Of April 10, 1997 - Energy Law), - Current Documents Confirming Entry On The List Of Persons Authorized To Inspect Chimney Flues In Accordance With The Act Of July 7, 1994, Construction Law, Art. 62 Section 6 Run By The Gener