GTR 105886842
Tenders Are Invited For Adaptation Of The Building Of The Social Welfare Home At Ul. Kurasia 7 In Tarnobrzeg To The Existing Fire Protection Regulations.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
105886842
Tendering Authority
Subscribe to view
Tender No
BZP-I.271.76.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of The Building Of The Social Welfare Home At Ul. Kurasia 7 In Tarnobrzeg To The Existing Fire Protection Regulations.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
22-12-2025
Closed
Work Detail
Execution Of Construction Works And Post-Construction Inventory Through Adaptation Of The Building Of The Social Welfare Home At Ul. Kurasia 7 In Tarnobrzeg To The Existing Fire Protection Regulations In The Scope Of: - Dismantling Supporting Structures For Boxes By Drilling Holes Or Unscrewing Them (Applies To Existing Smoke Detectors, Rops And Fire Protection Control Panel), - Piercing Holes In Walls Or Ceilings, - Laying Cables In Ready-Made Grooves On A Surface Other Than Concrete, - Screwing Pvc Electrical Installation Strips On Bricks, - Embedding Plastic Dowels And Metal Dowels Shot Into Walls Or Ceilings, - Installing A Compact Alarm Control Panel - Fire Alarm Control Panel, - Installing Power Supplies (Up To 12V Dc), Up To 6.5W - Smoke Exhaust/Fire Door Control Panel, - Installing Addressable, Universal, Optical Scattered Smoke Detectors, - Installing Addressable Multi-Sensor Smoke And Heat Detectors, - Installation Of Addressable Heat Detectors, - Installation Of Manual Fire Alarms, - Installation Of Manual Smoke Exhaust Buttons - Installation Of Acoustic And Optical Alarms, - In Addition To The Basic Design And Bill Of Quantities, As-Built Documentation Should Be Prepared Agreed With A Fire Expert And Signed By Designers Of A Given Industry Along With A Certificate Of Correct Execution - Air Vents Should Be Installed In 3 Staircases And Appropriate Automatic Door Opening Control Should Be Provided Air Supply Systems, - Colliding Doors In The Fire Zone Of The Staircase Should Be Properly Removed, - External Doors Should Be Replaced With Air Intake Doors With Parameters Consistent With The Technical Conditions For External Partitions Equipped With Appropriate Actuators, - Automatic Flap Control Connected To The New Fire Control Panel Should Be Implemented And Its Retrofitting Should Be Planned, - They Should Be Secured At The Transitions Between Fire Zones, - A Fire Scenario Should Be Prepared, - The Fire Safety Manual Of The Building Should Be Updated, Note: In The Scope Of The Contract, The Contractor Must Estimate The Costs Of Accompanying Works (Including Plastering, Filling, Painting). Moreover: - The Contractor Will Provide A Certificate Of Installation Execution And An Operation Book, In Which All Information Related To The Operation Of The Installation Should Be Entered (Alarms, Damages, Maintenance, Shutdowns, Etc.), - The Contractor Will Provide A Report On The Correct Operation Of All Elements Of The Installation And The Correct Operation Of The Controls Implemented By The Ssp. - The Contractor Will Train Designated Facility Staff To Take Appropriate Actions When All Events Are Signaled By The Control Panel
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
fe845a82-606d-4924-ad2c-f31ed52a994e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.