GTR 105873130

Bids Are Invited For Future, Eventual And Installment Provision Of Specialized Services In Occupational Safety, Aimed At Preparing And Updating The Technical Report On Environmental Working Conditions (Ltcat), Risk Management Program (Pgr), Occupational Health Medical Control Program (Pcmso), Unhealthy And Dangerous Technical Report (Ltip), Social Security Professional Profile (Ppp) And Osh Management - Occupational Health And Safety For The E-Social, With Issuance And Sending Of Files Relating To Osh Events, In Accordance With Applicable Legal And Regulatory Requirements, Intended For Municipal Employees In This Municipality.

ICB — International Competitive Bid Closed South America
Tender Information
GTR Reference
105873130
Tendering Authority
Subscribe to view
Tender No
00023025/2025
Financer Name
Self-Funded
Work Title
Bids Are Invited For Future, Eventual And Installment Provision Of Specialized Services In Occupational Safety, Aimed At Preparing And Updating The Technical Report On Environmental Working Conditions (Ltcat), Risk Management Program (Pgr), Occupational Health Medical Control Program (Pcmso), Unhealthy And Dangerous Technical Report (Ltip), Social Security Professional Profile (Ppp) And Osh Management - Occupational Health And Safety For The E-Social, With Issuance And Sending Of Files Relating To Osh Events, In Accordance With Applicable Legal And Regulatory Requirements, Intended For Municipal Employees In This Municipality.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South America
Political Region
BRIC,G20
Last Date of Bid Submission
05-01-2026 Closed
Work Detail
Ltcatltcat – Technical Report On Environmental Working Conditions The Technical Report On Environmental Working Conditions Must Be Prepared By An Occupational Safety Engineer Or Occupational Doctor And A Quantitative Analysis Must Be Carried Out As Required By Current Regulations, In Particular Regarding: A - Continuous And Impact Noise: Continuous And Impact Noise Analyzes Must Be Carried Out By Dosimetry, Means Of Collecting Samples By Dosimetry, Interpretation And Characterization Of The Results, Based On The Technical Procedures Established By Nho 01 Of Fundacentro And Annexes 1 And 2 Of Nr 15 Of Ordinance No. 3214/78 And Annex Iv Of Decree No. 3048/99 And Its Updates Or Other Standards That May Come Into Force. Replace.B - Thermal Overload: The Collection Of Samples Through The Analysis Of Temperature Conditions And Working Regimes Must Be Carried Out At The Supposed Most Unfavorable Time, With Interpretation And Characterization Of The Results, Based On The Technical Procedures Established By Nho 06 Of Fundacentro And Annexes 3 Of Nr 15 Of Ordinance No. 3214/78 And Annex Iv Of The Decree No. 3048/99 And Its Updates Or Other Standards That May Replace It. It Must Be Carried Out In Accordance With The Criteria Of The Acgih (Information For The Pgr) And Brazilian Legislation - Nr 15 (Information With Reflections On The Health Surplus/Mtb And Special Retirement/Inss). Immediate, Pgrpgr- Risk Management Program Risk Management Program – Pgr, Which In Turn Seeks To Identify Physical, Chemical, Biological And Ergonomic Risks In The Work Environment And Must Be Carried Out On The Premises Of The Municipality Of Barroso/Mg, Considering All Jobs Where There Are Workers Linked To The Municipality In Order To Provide A Basis For All Routines Regarding E-Social. The Pgr Must Be Prepared In Accordance With The Obligation Of Nr 09 And 01 Of The Ministry Of Labor, Which Must Be Presented In A Base Document Which Must Contain At Least The Following Structure: A) Introduction; B) Risk Definitions And Criteria; C) Characterization Of Environments/Work Units; D) Characterization Of Work Activities/Processes; Of Risks; Which Comprises The Stages Of Hazard Identification And Risk Assessment: Form Of Recording, Maintenance And Dissemination Of Data; F) Strategy, Schedule And Action Plan; G) Annual Planning With Establishment Of Goals, Priorities; Of Personal Protective Equipment (Ppe) Only When The Technical Unfeasibility Of Adopting Collective Protection Measures Has Been Proven, Or When These Are Not Sufficient Or Are In The Study, Planning Or Implementation Phase, Or Even On A Complementary Or Emergency Basis, As Per Nr 09.
Key Value
Tender Value
198,280 - BRL
Tender Documents
Global Tender Document
ee51d529-4105-4868-897d-34190f78095a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders