The Subject Of The Order Is A Comprehensive Supply (Sale And Provision Of Distribution Services) Of High-Methane Natural Gas Type E, At A Pressure Of Up To 0.5 Mpa, To Buildings Provided By The District Office In Tarnobrzeg For Free Use By Spzzoz In Nowa Dęba. B) Natural Gas Will Be Supplied To The Following Buildings: - Boiler House No. 1 Ul. Maria Skłodowska-Curie 1A; 39-460 Nowa Dęba; The Boiler Room Is Equipped With Two Gas Boilers With A Capacity Of 575 Kw Each, The Ordered Power Is 65 M3 / H, The Current Tariff Group W-5, W-6.1 Ta., The Measuring System Consists Of: - Bellows Reducer Type R/70 - Pulse Recorder Type Mac R4 Estimated Gas Consumption Over A 12-Month Period Is: 126,115 M³, I.E. 1,397 192 Kwh. Intake Point Number: 8018590365500019359781 - Boiler Plant No. 2 Ul. Kościuszki 1C; 39-460 Nowa Dęba; The Boiler Room Is Equipped With A Gas Boiler With A Capacity Of 250 Kw, The Ordered Power Is 25 M3/H, The Current Tariff Group W-5A.1 Ta, The Measuring System Consists Of: - Bellows Reducer - Mac R4 Pulse Recorder Estimated Gas Consumption Over A Period Of 12 Months Is 37,389 M3, I.E. 414,198 Kwh.Number Of The Consumption Point: 8018590365500019359644 - Kotłownia No. 3 Ul. Rzeszowska 8; 39-460 Nowa Dęba; The Boiler Room Is Equipped With Two Gas Boilers With A Capacity Of 65 Kw Each, The Contractual Capacity Is Up To 10 M3/H, The Current W-4 Tariff Group, The Measuring System Consists Of: - Crs-03 Pulse Recorder. Estimated Gas Consumption Over The Period Of 12 Months Is: 17,430 M3, I.E. 194,019 Kwhnumber Of The Consumption Point: 8018590365500071772184 The Branch Responsible For Psg For Each Consumption Point Is The Gas Plant Branch In Jasło.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.