The Planning And Monitoring Goals Are To Improve Computing And Mühlhausen Sand Trap. The Existing Screening And Sand Trap System In Mühlhausen Was Completed In 2005 And Now Has Some Structural And Operational Defects And Weak Points. To The Existing Building And The Existing Building Fabric Various Structural Renovation Measures Need To Be Carried Out. These Can Not All Of Them Can Be Implemented During Ongoing Drainage Operations. The Weak Points Of The System Technology Must Be Repaired.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.