GTR 105808900
Tenders Are Invited For Load-Bearing Structure Design Services – Structural Planning According To Paragraph 51 Hoai - School Center Peslmüllerstraße 6-8
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
105808900
Tendering Authority
Subscribe to view
Tender No
806176-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Load-Bearing Structure Design Services – Structural Planning According To Paragraph 51 Hoai - School Center Peslmüllerstraße 6-8
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
14-01-2026
Closed
Work Detail
Load-Bearing Structure Design Services – Structural Planning According To Paragraph 51 Hoai - School Center Peslmüllerstraße 6-8. Structural Planning According To Paragraph 51 Hoai - School Center Peslmüllerstraße 6-8, New Building, Expansion, Conversion / Modernization / Existing Renovation, Middle School (4 Rooms) - High School (4 Rooms) - Elementary School (4 Rooms), Sports Halls And Swimming Pools, Central Supply Kitchen, Cafeteria, Technology, Construction Pit And Shoring Initial Situation: The Primary And Middle School At Peslmüllerstraße 8 Dates From The Year 1971. The 4-Story Building (Basement To 2Nd Floor) Consists Of A Classroom Wing (4 Rooms Each) With A Connecting Corridor To The Gym, A Sports Wing With A Triple Sports Hall, A Single Sports Hall And A Swimming Pool. The Primary And Middle School With Sports Wing, Connecting Corridor And The Forecourt With Amphitheater Are Listed Buildings. The Bertolt-Brecht-Gymnasium From 1972 Is A Three-Class Girls High School. In 2016, A Pavilion Was Built As An Interim Solution, With Classrooms (Gs) And Cafeteria For The Gs And Ms. The Existing Primary School, Middle School And High School Buildings Have Serious Deficiencies In The Areas Of Fire Protection, Technical Equipment, Pollution, Heat And Sound Insulation, Statics And Accessibility. The Construction Measures Described Below Are Taking Place In Several Construction Phases While The School Is In Operation, With A High Degree Of Complexity And Construction Logistics. Gross Floor Area (Existing And New): Approx. 37,858 Sqm Program: Primary School: *All-Day Expansion Of The 4-Train Gs According To The Learning House Concept With Cafeteria *Modernization / Conversion / Renovation (Gi) Of The Gs (Pesl 8) Under Monument Protection Requirements, *Modernization / Conversion / Existing Renovation (Gi) Triple Sports Hall, Single Sports Hall, 1 Swimming Pool (Pesl 8) Under Monument Protection Regulations Middle School: *Replacement New Building Of A 4-Class Ms According To The Learning House Concept, 4 Clusters Of 6 Classes Each, Including Demolition Of The Specialist Classroom Wing Gym High School: *New Construction Of An Extension To A 4-Class High School *Modernization / Conversion / Renovation Of The Existing Structure (Gi) Of The 3-Class Gym (Pesl 6) According To The Learning House Concept And Expansion Through Renovation And Extension New Construction Of A Double Sports Hall *Construction Of A Central Supply Kitchen For All Types Of Schools With Canteens, Technology Center *New Construction Of An Alternative Pavilion For All Construction Work And Later Demolition
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1028cf67-65c3-4dcb-928d-c80334351085.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.