The Subject Of The Order Is In Particular The Technical Project Planning And Planning, Construction (Manufacture), Delivery, Construction (Assembly), Installation, Commissioning, Proper Handover, As Well As The Long-Term Maintenance Of A Charging Infrastructure For The Permanent Operation Of Electric Buses With Exclusively Electric Drive In Battery Operation. All Required Components From The Transfer Point Of The Supply Network To The Contact System To The Vehicle Are Part Of The Contractors Scope Of Delivery. A Total Of Up To 27 Charging Points On Stationary Chargers, With Ccs-Combo 2 Charging Plugs, Distributed Across Two Halls (Hall 1: Up To 9 Charging Points, Hall 2: Up To 18 Charging Points) Of Aseag, With At Least 90 Kw Of Simultaneous Charging Power Per Charging Point For Overnight Charging, Must Be Set Up. The Charging Points Must Be Interconnectable So That An Interconnected Charging Power Of At Least 150 Kw Is Permanently Possible At Each Charging Point, Depending On The Connection. An Appropriately Sized Sub-Distribution Must Be Delivered For Each Hall. Further Details Can Be Found In The Service Description. For This Purpose, A Delivery Contract Is To Be Concluded. After All Components Have Been Put Into Operation, The Contractor Must Be Responsible For All Components And The Full Functionality Of The Charging Stations In The Long Term And, If Necessary, Deliver And Install Them. For This Purpose, An Availability Contract For A Term Of 5 Years Is Planned (With An Extension Option To A Maximum Of 12 Years).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.