Tenders Are Invited For Public-Service Buses – Delivery Of 6 Brand New Low-Floor City Buses Of The Maxi Class With Electric Drive, Along With The Delivery, Assembly And Commissioning Of 4 Brand New Charging Stations
Tenders Are Invited For Public-Service Buses – Delivery Of 6 Brand New Low-Floor City Buses Of The Maxi Class With Electric Drive, Along With The Delivery, Assembly And Commissioning Of 4 Brand New Charging Stations
Public-Service Buses – Delivery Of 6 Brand New Low-Floor City Buses Of The Maxi Class With Electric Drive, Along With The Delivery, Assembly And Commissioning Of 4 Brand New Charging Stations. I. The Subject Of The Order In This Procedure Is: 1) Production And Delivery Of 6 Pieces Of Brand New, One Brand, Low-Floor, Single-Section, Ecological City Buses Of The Maxi Class, With Electric Drive, Intended For Use In Public Transport In The City Of Siedlce And Suburban Lines, Equipped With A Number Of Solutions Improving The Usability Of Public Transport And Passenger Safety, As Well As Adapted To The Needs Of People With Disabilities, Called Buses In The Content Of The Swz; The Order Also Includes Granting Authorization And Retrofitting The Technical Facilities Of The Public Transport Operator In Siedlce - Miejskie Przedsiębiorstwo Komunikacyjne W Siedlce Sp. Z O. O. (Referred To As The Transport Operator In The Swz Content) - With The Necessary Devices Enabling Diagnostics And Technical Repairs Of The Delivered Vehicles; 2) Delivery, Assembly And Commissioning Of 4 Brand-New, Stationary, Electric Plug-In Chargers, Including: A) 1 Two-Station Charging Station With A Charging Power Of 2×60 Kw At The Mpk Depot At Ul. Starzyńskiego 20, 1 Pc. Two-Station Charging Station With A Charging Power Of 2×60 Kw At Ul. Kalinowa; And 2 Single-Station Units With A Power Of 120 Kw Each In The Transfer Center At Ul. W. Pilecki. B) Preparation Of Design Documentation, Installation Of Internal Power Lines Necessary To Supply Electricity To The Bus Charging Stations At The Mpk Depot, In The Transfer Center At Ul. W. Pilecki, At The Bus Terminus At Ul. Kalinowa. Obtaining Permits And Decisions Necessary To Launch The Charging Station And Obtain Technical Acceptance. The Charging Station At The Mpk Depot Does Not Require Power Connections, There Is A Prepared Cable Connector At The Place Of Foundation To Connect The New Station, All That Is Required Is Its Connection To The Power Supply, Proper Foundation And Connection To The Telemetry System. In The Depot, Near The Connector, There Is A Transformer With An Appropriate Reserve Of Connection Power; 3) Conducting Training For The Transport Operators Employees Regarding The Operation And Servicing Of Vehicles Powered By Electricity, Operation, Servicing And Management Of The Process Of Charging Energy Storage In Buses And Operation And Supervision Of The Charging Infrastructure, Including The Use Of All Delivered Components, 4) Delivery Of Technical And Operational Documentation (Instructions, Catalogues, Diagrams, Etc.), Presented In The Description Of The Subject Of The Order, In The Field Of Buses And Charging Infrastructure, 5) Delivery Of Equipment To The Transport Operators Service Station, A Set Of Tools And Specialized Devices Enabling Obtaining Internal Authorization Of The Bus Manufacturer And The Manufacturer Of Charging Stations, Used For The Ordering Partys Own Needs. The Ordering Party Reserves The Right To Have Three People Inspect It Once
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.